Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1222-00034
Permit Details
Apply Date:
12/05/2022
Applicant:
David Martin
Description:
SFR K35I T21-M0034
Permit Reviews
Permit Number - TC-MDP-1222-00034
Permit Status: Issued
Permit Description: SFR K35I T21-M0034
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/17/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/28/2023 | APPROVED |
08/08/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/11/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1222-00034
Permit Status: Issued
Permit Description: SFR K35I T21-M0034
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
02/17/2023 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
02/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
06/15/2023 | Sewer condition must be accepted and released by Pima County |
Conditions
Permit Number - TC-MDP-1222-00034
Permit Status: Issued
Permit Description: SFR K35I T21-M0034
Date | Description | Comments |
---|---|---|
02/17/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
02/17/2023 | Post-Installed Anchor Inspection Report is required. | |
02/17/2023 | Post-Tension Inspection Report is required. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-1222-00034
Permit Description: SFR K35I T21-M0034
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/17/2023 | COT - RSPL - Rough Soil | Passed | Approved. Okay to backfill. Shading is required. 4/17/2023 | |
04/17/2023 | COT - RSPL - Sewer | Passed | Approved. Okay to backfill. Shading is required. 4/17/2023 | |
04/17/2023 | COT - RSPL - Yard Water Line | Passed | Approved. Okay to backfill. Shading is required. 4/17/2023 | |
04/26/2023 | COT - RSBU - Preslab | Passed | ||
04/26/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
04/26/2023 | COT - RSEL - Electrical Underground | Passed | ||
04/26/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
05/11/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/11/2023 | COT - RSBU - Roof Nailing | Passed | ||
05/31/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 5/31/2023 | |
05/31/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
05/31/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
06/09/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/31/2023 | COT - BULD - SWG Clearance | Passed | Approved, SWG clearance is required for the new meter | |
08/08/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/08/2023 | COT - RSPL - Gas Final | Passed | ||
08/10/2023 | RSBU - Building Final | Passed | Approved corrections were made. 8/10/2023 | |
08/10/2023 | COT - RSEL - Electrical Final | Passed | Approved corrections were made. 8/10/2023 | |
08/10/2023 | COT - RSME - Mechanical Final | Passed | Approved corrections were made. 8/10/2023 | |
08/10/2023 | COT - RSPL - Plumbing Final | Passed | Approved corrections were made. 8/10/2023 |