Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
12/05/2022
Applicant:
mark wolfel
Description:
SFR K35I T21-M0034

Permit Reviews

Permit Number - TC-MDP-1222-00033
Permit Status: Issued
Permit Description: SFR K35I T21-M0034
Start Date Submittal Complete Date Status  
10/31/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/01/2023 APPROVED Review Details
12/05/2022 RESIDENTIAL NEW DWELLING v.1 12/14/2022 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1222-00033
Permit Status: Issued
Permit Description: SFR K35I T21-M0034
Total Outstanding Activity Conditions - 3
Date Name
06/15/2023 Sewer condition must be accepted and released by Pima County
11/01/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/01/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - TC-MDP-1222-00033
Permit Status: Issued
Permit Description: SFR K35I T21-M0034
Date Description Comments
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/01/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-1222-00033
Permit Description: SFR K35I T21-M0034
Total Completed Inspections - 35
Date Description Inspector Results Comments
01/04/2023 COT - RSPL - Rough Soil Passed okay to backfill. shading required
01/11/2023 COT - RSEL - Electrical Underground Passed
01/12/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
01/12/2023 COT - RSBU - Preslab Passed Approved, okay for concrete placement
01/12/2023 COT - RSEL - Grounding/Bonding Passed Ufer
02/02/2023 COT - RSBU - Exterior Clips/Sheathing Passed
02/02/2023 COT - RSBU - Roof Nailing Passed
03/06/2023 RSME - Mechanical Progress Passed
03/06/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/06/2023 BULD - Electrical Clearance Passed clearance for TEP ECO.
03/16/2023 COT - RSBU - Interior Shear Bracing Passed
05/16/2023 COT - BULD - SWG Clearance Passed
05/16/2023 RSBU - Building Progress Passed
05/16/2023 COT - RSBU - Firewall/Fire Barrier/Firestop Passed N/A 5/16/2023
05/16/2023 COT - RSBU - Masonry Pregrout Passed Duplicate inspection 5/16/2023
05/16/2023 COT - RSBU - Stem Wall/Retaining Wall Passed N/A 5/16/2023
05/16/2023 RSEL - Electrical Progress Passed
05/16/2023 COT - RSEL - Outdoor Lighting Passed
05/16/2023 COT - RSME - Mechanical Underground Passed Duplicate inspection 5/16/2023
05/16/2023 COT - RSMH - Mobile/Mod Home Electrical Passed N/A 5/16/2023
05/16/2023 COT - RSMH - Mobile/Mod Home Final Passed N/A 5/16/2023
05/16/2023 COT - RSMH - Mobile/Mod Home Gas Passed N/A 5/16/2023
05/16/2023 COT - RSMH - Mobile/Mod Home Plumbing Passed N/A 5/16/2023
05/16/2023 COT - RSPL - Backwater Valve Passed
05/16/2023 COT - RSPL - Gas Pressure Test Passed
05/16/2023 RSPL - Plumbing Progress Passed
05/16/2023 COT - RSPL - Sewer Passed
05/16/2023 COT - RSPL - Yard Water Line Passed
05/16/2023 RSBU - Building Final Passed Duplicate inspection. 5/16/2023
05/16/2023 COT - RSEL - Electrical Final Passed Duplicate inspection. 5/16/2023
05/16/2023 COT - RSME - Mechanical Final Passed Duplicate inspection. 5/16/2023
05/16/2023 COT - RSPL - Gas Final Passed N/A 5/16/2023
05/16/2023 COT - RSPL - Gas Reconnect Passed N/A 5/16/2023
05/16/2023 COT - RSPL - Plumbing Final Passed Duplicate inspection. 5/16/2023
05/22/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
1_TRUSS CALCS K35I_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
210841-G WESTBRIDGE AT SILVERBELL LOT 20 - PT REPORT-2023-05-04_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL_INSPECTION-2022-12-05_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1_V1 (1)_V1.PDF DOCUMENTS VIEW
1_SPECIAL_INSPECTION-2022-12-05_V1-2022-12-14_V1.PDF DOCUMENTS VIEW