Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
12/31/2025
Applicant:
Angelic Wajszcuk
Description:
Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)

Permit Reviews

Permit Number - TC-MDP-1125-00743
Permit Status: Inspections
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Start Date Submittal Complete Date Status  
12/31/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 01/09/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1125-00743
Permit Status: Inspections
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Total Outstanding Activity Conditions - 5
Date Name
01/09/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/09/2026 Post-Installed Anchor Inspection Report is required.
01/09/2026 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
11/24/2025 Post-Tension Inspection Report is required.
11/24/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1125-00743
Permit Status: Inspections
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Date Description Comments
01/09/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/24/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/24/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1125-00743
Permite Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/01/2026 COT - RSPL - Gas Pressure Test N/A Not Applicable
07/02/2026 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1125-00743
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Total Completed Inspections - 11
Date Description Inspector Results Comments
07/02/2026 COT - RSPL - Rough Soil Passed
07/02/2026 COT - RSPL - Sewer Passed
07/09/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 07/09/2026
Approved, verified setbacks and reinforcement.
07/09/2026 COT - RSBU - Preslab Passed 07/09/2026
Approved, verified setbacks and reinforcement. Okay for concrete placement.
07/09/2026 COT - RSEL - Electrical Underground Passed
08/20/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/20/2026 COT - RSBU - Roof Nailing Passed
08/20/2026 COT - RSPL - Yard Water Line Passed
08/28/2026 BULD - Electrical Clearance Passed 8-28-26 ECO Clearance approved
09/17/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9-17-26 all corrections were made during the time of inspection OK to proceed
10/08/2026 COT - RSBU - Interior Shear Bracing Passed