Permit: TC-MDP-1125-00724
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
7467 S PASEO MONTE DE ORO
Address NEW:
7467 S PASEO MONTE DE ORO
Apply Date:
11/12/2025
Applicant:
Angelic Wajszcuk
Description:
REV1: Updated electrical plans Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Permit Reviews
Permit Number - TC-MDP-1125-00724
Permit Status: Complete
Permit Description: REV1: Updated electrical plans
Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/20/2026 | SITE FROM MODEL PERMIT - SUBDIVISION REVISION v.1 | 03/06/2026 | APPROVED |
| 07/17/2026 | SPECIAL INSPECTION REVIEW v.1 | 07/17/2026 | APPROVED |
| 07/02/2026 | SPECIAL INSPECTION REVIEW v.1 | 07/06/2026 | APPROVED |
| 11/14/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 11/25/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1125-00724
Permit Status: Complete
Permit Description: REV1: Updated electrical plans
Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
| Date | Description | Comments |
|---|---|---|
| 11/18/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/25/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 11/18/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/12/2025 | Post-Tension Inspection Report is required. | |
| 11/18/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 11/12/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/12/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/18/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 11/12/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1125-00724
Permite Description: REV1: Updated electrical plans
Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 02/05/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1125-00724
Permit Description: REV1: Updated electrical plans
Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2026 | COT - RSPL - Rough Soil | Passed | 2.5.26 Approved |
|
| 02/05/2026 | COT - RSPL - Sewer | Passed | 2.5.26 Approved |
|
| 02/05/2026 | COT - RSPL - Yard Water Line | Passed | 2.5.26 Approved |
|
| 02/10/2026 | COT - RSBU - Preslab | Passed | 02/10/2026 Approved per site plan, setbacks, foundation details. Ufer in place. Okay for concrete placement. |
|
| 02/10/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 02/10/2026 Approved per site plan, setbacks, foundation details. Ufer in place. Okay for concrete placement. |
|
| 02/10/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 03/09/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 03/09/2026 Approved per plan. |
|
| 03/09/2026 | COT - RSBU - Roof Nailing | Passed | 03/09/2026 Approved per plan and truss calcs. |
|
| 04/07/2026 | BULD - Electrical Clearance | Passed | 04/07/2026 Approved clearance TEP ECO. |
|
| 04/07/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 04/07/2026 Approved, added missing outlet in upstairs bedroom and moved smoke detector 3' from air register. |
|
| 04/23/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/23/2026 | COT - RSEL - Electrical Final | Passed | ||
| 06/23/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/23/2026 | COT - RSME - Mechanical Final | Passed | ||
| 06/23/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 06/23/2026 | RSBU - Building Progress | Passed | ||
| 07/22/2026 | ENGR Engineering Final | Passed | ||
| 07/22/2026 | RSBU - Building Final | Passed |