Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
01/15/2025
Applicant:
Description:
SFR RKM45X T21-M0094 REVISION-Structural change (Model master plan TC-MDP-0123-00356)

Permit Reviews

Permit Number - TC-MDP-1124-01363
Permit Status: Inspections complete
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change (Model master plan TC-MDP-0123-00356)
Start Date Submittal Complete Date Status  
01/24/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/04/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1124-01363
Permit Status: Inspections complete
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change (Model master plan TC-MDP-0123-00356)
Total Outstanding Activity Conditions - 6
Date Name
01/27/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/27/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/27/2025 Post-Installed Anchor Inspection Report is required.
01/27/2025 Post-Tension Inspection Report is required.
01/27/2025 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/22/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1124-01363
Permit Status: Inspections complete
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change (Model master plan TC-MDP-0123-00356)
Date Description Comments
11/22/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/22/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/27/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1124-01363
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change (Model master plan TC-MDP-0123-00356)
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/12/2025 COT - RSPL - Rough Soil Passed Passed 3/12/25 ok to backfill
03/12/2025 COT - RSPL - Sewer Passed Passed 3/12/25 ok to backfill
03/12/2025 COT - RSPL - Yard Water Line Passed Passed 3/12/25 ok to backfill
03/24/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 3-24-25, excavation /rebar and setbacks approved.
03/24/2025 COT - RSBU - Preslab Passed 3-24-25, preslab,excavation /rebar and setbacks approved. Okay to pour concrete.
03/24/2025 COT - RSEL - Electrical Underground Passed 3-24-25, electrical underground approved.
04/17/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/17/2025 COT - RSBU - Roof Nailing Passed
05/06/2025 BULD - Electrical Clearance Passed Clearance for TEP ECO. 5/6/2025
05/06/2025 COT - RSEL - Grounding/Bonding Passed
05/07/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5/7/25 corrections made
05/07/2025 COT - RSPL - Gas Pressure Test Passed 5/7/25 corrections made
05/15/2025 COT - RSBU - Interior Shear Bracing Passed 5/15/25
Pass
07/02/2025 COT - BULD - SWG Clearance Passed 7-2-25 clearance for SW Gas
07/14/2025 COT - RSEL - Electrical Final Passed 7.14.25
All receptacles are per plan and up to code. Firedoor at garage verified, thermostat height verified. Breaker schedule verified. No open unused areas at panel. Lines secured. AAV at island. Attic unit supported and installed per code. Max breaker for AC verified correct. Hammer arrestors verified.
07/14/2025 COT - RSEL - Outdoor Lighting Passed 7.14.25
All receptacles are per plan and up to code. Firedoor at garage verified, thermostat height verified. Breaker schedule verified. No open unused areas at panel. Lines secured. AAV at island. Attic unit supported and installed per code. Max breaker for AC verified correct. Hammer arrestors verified.
07/14/2025 COT - RSME - Mechanical Final Passed 7.15.25
Checklist verified all items satisfactory
07/14/2025 COT - RSPL - Plumbing Final Passed 7.14.25
All receptacles are per plan and up to code. Firedoor at garage verified, thermostat height verified. Breaker schedule verified. No open unused areas at panel. Lines secured. AAV at island. Attic unit supported and installed per code. Max breaker for AC verified correct. Hammer arrestors verified.
07/14/2025 ENGR Engineering Final Passed
07/14/2025 RSBU - Building Final Passed 7.14.25
All receptacles are per plan and up to code. Firedoor at garage verified, thermostat height verified. Breaker schedule verified. No open unused areas at panel. Lines secured. AAV at island. Attic unit supported and installed per code. Max breaker for AC verified correct. Hammer arrestors verified.
07/14/2025 RSBU - Building Progress Passed 7.14.25
All receptacles are per plan and up to code. Firedoor at garage verified, thermostat height verified. Breaker schedule verified. No open unused areas at panel. Lines secured. AAV at island. Attic unit supported and installed per code. Max breaker for AC verified correct. Hammer arrestors verified.