Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
11/15/2024
Applicant:
Andrea Flood
Description:
SFR RKM45X T21-M0094 REVISION-Structural change (Model master plan TC-MDP-0123-00356)

Permit Reviews

Permit Number - TC-MDP-1124-01362
Permit Status: Inspections
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change (Model master plan TC-MDP-0123-00356)
Start Date Submittal Complete Date Status  
01/24/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/03/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1124-01362
Permit Status: Inspections
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change (Model master plan TC-MDP-0123-00356)
Total Outstanding Activity Conditions - 6
Date Name
01/24/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/24/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/24/2025 Post-Installed Anchor Inspection Report is required.
01/24/2025 Post-Tension Inspection Report is required.
01/24/2025 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/22/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1124-01362
Permit Status: Inspections
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change (Model master plan TC-MDP-0123-00356)
Date Description Comments
11/22/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/22/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/24/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1124-01362
Permite Description: SFR RKM45X T21-M0094 REVISION-Structural change (Model master plan TC-MDP-0123-00356)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/29/2025 COT - RSBU - Interior Shear Bracing N/A Re-inspection required 5-29-25: not ready-missing drywall at different areas.
07/29/2025 ENGR Engineering Final N/A Failed There is paint and or stucco dumped on the ground in the back yard. Back Yard needs to be cleaned up.
Sewer clean out pipe collar for cap needs to be glued correctly down in driveway.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1124-01362
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change (Model master plan TC-MDP-0123-00356)
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/14/2025 COT - RSPL - Rough Soil Passed
03/14/2025 COT - RSPL - Sewer Passed
03/14/2025 COT - RSPL - Yard Water Line Passed
03/26/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
03/26/2025 COT - RSEL - Electrical Underground Passed
03/26/2025 COT - RSBU - Preslab Passed
04/24/2025 COT - RSBU - Roof Nailing Passed Passed 4/24/24
04/28/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/16/2025 BULD - Electrical Clearance Passed 5/16/25
TEP CLEARANCE: ECO
05/16/2025 COT - RSEL - Grounding/Bonding Passed
05/16/2025 COT - RSPL - Gas Pressure Test Passed
05/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 5/20/25 corrections made
05/30/2025 COT - RSBU - Interior Shear Bracing Passed 5-30-25: interior shear bracing approved. Okay to tape & texture
07/15/2025 COT - BULD - SWG Clearance Passed Passed CLEARANCE SWG 7/15/25
07/29/2025 COT - RSEL - Electrical Final Passed
07/29/2025 RSBU - Building Progress Passed
07/31/2025 COT - RSPL - Plumbing Final Passed
07/31/2025 COT - RSME - Mechanical Final Passed
07/31/2025 COT - RSEL - Outdoor Lighting Passed
08/04/2025 ENGR Engineering Final Passed
08/04/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-01-23_V1.PDF DOCUMENTS VIEW