Permit: TC-MDP-1124-01332
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9142 E INDIGO BLUFF ST
Address NEW:
9142 E INDIGO BLUFF ST
Apply Date:
11/12/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
Permit Reviews
Permit Number - TC-MDP-1124-01332
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/26/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/11/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1124-01332
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/05/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 03/05/2025 | Post-Tension Inspection Report is required. |
| 11/21/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-1124-01332
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
| Date | Description | Comments |
|---|---|---|
| 11/21/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 11/21/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1124-01332
Permite Description: SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 4/18/25 1. At stairs, missing an A34 in middle stringer 2. Improper blocking at stringer, plan call for 2x8 in between stringers 3. Blocking needed at Girder truss perpendicular to stairs, plan calls for 2x8 bridge blocking. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1124-01332
Permit Description: SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/28/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 03/28/2025 | COT - RSPL - Sewer | Passed | ||
| 03/28/2025 | COT - RSPL - Rough Soil | Passed | ||
| 03/28/2025 | COT - RSPL - Backwater Valve | Passed | ||
| 04/04/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 4/4/25 ok to pour concrete | |
| 04/04/2025 | COT - RSBU - Preslab | Passed | Passed 4/4/25 ok to pour concrete | |
| 04/04/2025 | COT - RSEL - Electrical Underground | Passed | Passed 4/4/25 ok to pour concrete | |
| 04/18/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 04/23/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4/23/25 corrections made | |
| 05/08/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed 5/8/25 | |
| 05/08/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 5/8/25 | |
| 05/08/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 5/8/25 | |
| 05/28/2025 | COT - RSBU - Interior Shear Bracing | Passed | 5/28/25 Pass |
|
| 05/30/2025 | BULD - Electrical Clearance | Passed | 5/30/25 TEP CLEARANCE: ECO |
|
| 07/01/2025 | COT - BULD - SWG Clearance | Passed | 7/1/25 SOUTHWEST GAS CLEARANCE: SWG |
|
| 07/08/2025 | ENGR Engineering Final | Passed | Site is complete according to approved plans. CofO ready. | |
| 07/16/2025 | COT - RSEL - Electrical Final | Passed | Passed final 7/16/25 | |
| 07/16/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 7/16/25 | |
| 07/16/2025 | COT - RSME - Mechanical Final | Passed | Passed final 7/16/25 | |
| 07/16/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 7/16/25 | |
| 07/16/2025 | RSBU - Building Final | Passed | Passed final 7/16/25 | |
| 07/16/2025 | RSBU - Building Progress | Passed | Passed final 7/16/25 |