Permit: TC-MDP-1124-01330
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
4663 S VERDIN VALLEY DR
Address NEW:
4663 S VERDIN VALLEY DR
Apply Date:
11/12/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
Permit Reviews
Permit Number - TC-MDP-1124-01330
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/04/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 12/10/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1124-01330
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 11/21/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 12/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 12/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 12/04/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-1124-01330
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
| Date | Description | Comments |
|---|---|---|
| 11/21/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1124-01330
Permit Description: SFR BT2685-228 T22-M0012 (Model master plan TC-MDP-1222-00148)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2025 | COT - RSPL - Yard Water Line | Passed | 01/07/25 Ok to backfill, shading required |
|
| 01/07/2025 | COT - RSPL - Sewer | Passed | ||
| 01/09/2025 | COT - RSPL - Rough Soil | Passed | 1/9/25 corrections made | |
| 01/14/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 1-14-25, excavation/setbacks approved. | |
| 01/14/2025 | COT - RSBU - Preslab | Passed | 1-14-25, preslab approved. Okay to pour concrete. | |
| 01/14/2025 | COT - RSEL - Electrical Underground | Passed | 1-14-25, electrical underground approved | |
| 01/27/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 01/27/2025 | COT - RSBU - Roof Nailing | Passed | pass | |
| 02/12/2025 | BULD - Electrical Clearance | Passed | 2/12/25 approval for TEP ECO | |
| 02/18/2025 | COT - RSEL - Grounding/Bonding | Passed | 2-18-25, intermediates approved. Okay to continue with construction. | |
| 02/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2-18-25, intermediates approved. Okay to continue with construction. | |
| 02/18/2025 | COT - RSPL - Gas Pressure Test | Passed | 2-18-25, approved. Okay to continue with construction. | |
| 02/27/2025 | COT - RSBU - Interior Shear Bracing | Passed | 2-27-25, interior shear bracing inspection approved pending City. Okay to tape & texture drywall | |
| 04/10/2025 | COT - BULD - SWG Clearance | Passed | Approved new meter placement - SWG Clearance is required | |
| 04/23/2025 | ENGR Engineering Final | Passed | CO READY | |
| 05/02/2025 | COT - RSEL - Electrical Final | Passed | Passed final 5/2/25 | |
| 05/02/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 5/2/25 | |
| 05/02/2025 | COT - RSME - Mechanical Final | Passed | Passed final 5/2/25 | |
| 05/02/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 5/2/25 | |
| 05/02/2025 | RSBU - Building Final | Passed | Passed final 5/2/25 | |
| 05/02/2025 | RSBU - Building Progress | Passed | Passed final 5/2/25 |