Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
9549 E HARKES DR
Address NEW:
9549 E HARKES DR
Apply Date:
12/06/2024
Applicant:
Brianna Quiroz
Description:
Arches Model Plan (Model master plan TC-MDP-1222-00129)

Permit Reviews

Permit Number - TC-MDP-1124-01319
Permit Status: Complete
Permit Description: Arches Model Plan (Model master plan TC-MDP-1222-00129)
Start Date Submittal Complete Date Status  
09/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/15/2025 APPROVED Review Details
12/13/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/21/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1124-01319
Permit Status: Complete
Permit Description: Arches Model Plan (Model master plan TC-MDP-1222-00129)
Date Description Comments
12/13/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
12/18/2024 Post-Tension Inspection Report is required.
11/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
12/18/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
12/18/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01319
Permite Description: Arches Model Plan (Model master plan TC-MDP-1222-00129)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/02/2025 COT - BULD - SWG Clearance N/A Not Applicable site does not use gas
07/02/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable site does not use gas
07/02/2025 BULD - Electrical Clearance N/A Re-inspection required Missing address label

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01319
Permit Description: Arches Model Plan (Model master plan TC-MDP-1222-00129)
Total Completed Inspections - 19
Date Description Inspector Results Comments
04/14/2025 COT - RSEL - Electrical Underground Passed
04/14/2025 COT - RSPL - Rough Soil Passed
04/14/2025 COT - RSPL - Sewer Passed
04/30/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 4/30/25 ok to pour concrete
04/30/2025 COT - RSBU - Preslab Passed Passed 4/30/25 ok to pour concrete
05/15/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/15/2025 COT - RSBU - Roof Nailing Passed
07/02/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7/2/25 passed
07/02/2025 COT - RSEL - Grounding/Bonding Passed 7/2/25 passed
07/02/2025 COT - RSPL - Yard Water Line Passed 7/2/25 passed
07/15/2025 BULD - Electrical Clearance Passed 7/15/25 corrections made CLEARANCE ECO
07/24/2025 COT - RSBU - Interior Shear Bracing Passed 2.24.25
Fastener schedule at shear walls verified. Proceed.
10/03/2025 COT - RSEL - Electrical Final Passed
10/03/2025 COT - RSEL - Outdoor Lighting Passed
10/03/2025 COT - RSME - Mechanical Final Passed
10/03/2025 COT - RSPL - Plumbing Final Passed
10/03/2025 RSBU - Building Final Passed
10/03/2025 RSBU - Building Progress Passed
10/09/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 74 SIC-2025-09-11_V1.PDF DOCUMENTS VIEW
Z140 ARCHES - TRUSS REVIEW LETTER - LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 74 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 74 SIC-2024-12-06_V1.PDF DOCUMENTS VIEW