Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
9548 E HARKES DR
Address NEW:
9548 E HARKES DR
Apply Date:
11/14/2024
Applicant:
Brianna Quiroz
Description:
Great Sand Dunes SFR Model Escalara (Model Master plan TC-MDP-1222-00137)

Permit Reviews

Permit Number - TC-MDP-1124-01318
Permit Status: Complete
Permit Description: Great Sand Dunes SFR Model Escalara (Model Master plan TC-MDP-1222-00137)
Start Date Submittal Complete Date Status  
11/15/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/05/2024 APPROVED Review Details
08/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/25/2025 APPROVED Review Details
08/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/19/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-1124-01318
Permit Status: Complete
Permit Description: Great Sand Dunes SFR Model Escalara (Model Master plan TC-MDP-1222-00137)
Date Description Comments
11/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/19/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/19/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/19/2024 Post-Tension Inspection Report is required.
11/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/19/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01318
Permite Description: Great Sand Dunes SFR Model Escalara (Model Master plan TC-MDP-1222-00137)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/30/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Fire foam and caulk penetrations throughout

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01318
Permit Description: Great Sand Dunes SFR Model Escalara (Model Master plan TC-MDP-1222-00137)
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/24/2025 COT - BULD - SWG Clearance Passed
02/24/2025 COT - RSPL - Rough Soil Passed
02/24/2025 COT - RSPL - Sewer Passed
02/24/2025 COT - RSPL - Gas Pressure Test Passed
03/05/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Footings, tie downs, and rebar per plan, ok to pour concrete 3/5/25
03/05/2025 COT - RSBU - Preslab Passed Footings, tie downs, and rebar per plan, ok to pour concrete 3/5/25
03/05/2025 COT - RSEL - Electrical Underground Passed Footings, tie downs, and rebar per plan, ok to pour concrete 3/5/25
03/05/2025 COT - RSEL - Grounding/Bonding Passed Footings, tie downs, and rebar per plan, ok to pour concrete 3/5/25
04/03/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 3 April 25
pass
04/03/2025 COT - RSBU - Roof Nailing Passed 3 April 25
pass
04/30/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO
04/30/2025 COT - RSPL - Yard Water Line Passed Passed 4/30/25
05/05/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5/5/25 corrections made
05/27/2025 COT - RSBU - Interior Shear Bracing Passed
09/05/2025 COT - RSEL - Electrical Final Passed
09/05/2025 COT - RSME - Mechanical Final Passed
09/05/2025 COT - RSEL - Outdoor Lighting Passed
09/05/2025 COT - RSPL - Plumbing Final Passed
09/05/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
09/05/2025 RSBU - Building Final Passed
09/05/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
DEAR REVIEWER- SIC ENGINEER LETTER 2025-2025-08-22_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 32 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 32 SIC-2024-11-14_V1.PDF DOCUMENTS VIEW