Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
9537 E HARKES DR
Address NEW:
9537 E HARKES DR
Apply Date:
11/07/2024
Applicant:
Brianna Quiroz
Description:
Big Bend Model Plan La Escalera (Model master plan TC-MDP-1222-00135)

Permit Reviews

Permit Number - TC-MDP-1124-01316
Permit Status: Complete
Permit Description: Big Bend Model Plan La Escalera (Model master plan TC-MDP-1222-00135)
Start Date Submittal Complete Date Status  
09/16/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/16/2025 APPROVED Review Details
01/31/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/06/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1124-01316
Permit Status: Complete
Permit Description: Big Bend Model Plan La Escalera (Model master plan TC-MDP-1222-00135)
Date Description Comments
11/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/31/2025 Post-Installed Anchor Inspection Report is required.
01/31/2025 Post-Tension Inspection Report is required.
11/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
01/31/2025 Soils Testing Special Inspection is Required.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01316
Permite Description: Big Bend Model Plan La Escalera (Model master plan TC-MDP-1222-00135)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/11/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable 7-11-25: not applicable
07/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 7-11-25: seal penetrations from an unconditioned space to a conditioned space at garage, DWV must be under test, seal penetration at upstairs decking located in bedroom northeast side.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01316
Permit Description: Big Bend Model Plan La Escalera (Model master plan TC-MDP-1222-00135)
Total Completed Inspections - 20
Date Description Inspector Results Comments
04/14/2025 COT - RSEL - Electrical Underground Passed
04/14/2025 COT - RSPL - Rough Soil Passed
04/14/2025 COT - RSPL - Sewer Passed
04/30/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 4/30/25 ok to pour concrete
04/30/2025 COT - RSBU - Preslab Passed Passed 4/30/25 ok to pour concrete
05/29/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 5-29-25, corrections made. Exterior clips/sheathing approved.
05/29/2025 COT - RSBU - Roof Nailing Passed 5-29-25, corrections made. Roof nailing,Exterior clips/sheathing approved.
07/11/2025 BULD - Electrical Clearance Passed 7-11-25: panel okay to be energized. ECO clearance sent to TEP.
07/11/2025 COT - RSEL - Grounding/Bonding Passed 7-11-25: approved
07/11/2025 COT - RSPL - Yard Water Line Passed 7-11-25: approved.
07/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7-11-25: intermediate inspection approved. Okay to continue with construction.
07/29/2025 COT - RSBU - Interior Shear Bracing Passed 7.29.25
Fastener schedule verified at shear walls and general fastener schedule verified throughout.
07/29/2025 COT - BULD - SWG Clearance Passed 7.29.25
Verified
10/21/2025 COT - RSEL - Electrical Final Passed
10/21/2025 COT - RSEL - Outdoor Lighting Passed
10/21/2025 COT - RSME - Mechanical Final Passed
10/21/2025 COT - RSPL - Plumbing Final Passed
10/21/2025 ENGR Engineering Final Passed
10/21/2025 RSBU - Building Final Passed
10/21/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 76 SIC-2025-09-11_V1.PDF DOCUMENTS VIEW
Z160 BIG BEND- TRUSS REVIEW LETTER - LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 76 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 76 SIC-2025-01-28_V1.PDF DOCUMENTS VIEW