Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6488 E PASEO BARANDA
Apply Date:
11/12/2024
Applicant:
Brianna Quiroz
Description:
Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)

Permit Reviews

Permit Number - TC-MDP-1124-01302
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Start Date Submittal Complete Date Status  
12/19/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.2 12/21/2024 APPROVED Review Details
06/09/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/09/2025 APPROVED Review Details
11/15/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 12/06/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-1124-01302
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Date Description Comments
11/19/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/08/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/19/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/19/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/08/2024 Post-Tension Inspection Report is required.
11/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/19/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01302
Permite Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/23/2025 COT - BULD - SWG Clearance N/A Not Applicable
01/23/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01302
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Total Completed Inspections - 19
Date Description Inspector Results Comments
01/23/2025 COT - RSPL - Rough Soil Passed 1/23/25 pass ok to backfill and shade.
01/23/2025 COT - RSPL - Sewer Passed 1/23/25 pass ok to backfill and shade.
01/23/2025 COT - RSPL - Yard Water Line Passed 1/23/25 pass ok to backfill and shade.
01/30/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1/30/25 pass
01/30/2025 COT - RSBU - Preslab Passed 1/30/25 pass
01/30/2025 COT - RSEL - Electrical Underground Passed 1/30/25 pass
02/24/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
02/24/2025 COT - RSBU - Roof Nailing Passed
03/11/2025 BULD - Electrical Clearance Passed 3-11-25, panel okay to be energized. ECO clearance sent to TEP.
03/25/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 3/25/25 ok to drywall
03/24/2025 COT - RSEL - Grounding/Bonding Passed 3/24/25 passed
04/07/2025 COT - RSBU - Interior Shear Bracing Passed
06/17/2025 COT - RSEL - Electrical Final Passed
06/17/2025 COT - RSEL - Outdoor Lighting Passed
06/17/2025 COT - RSME - Mechanical Final Passed
06/17/2025 COT - RSPL - Plumbing Final Passed
06/17/2025 ENGR Engineering Final Passed
06/17/2025 RSBU - Building Final Passed
06/17/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 98 FINAL SIC-2025-06-05_V1.PDF DOCUMENTS VIEW
Z350 HARDING- TRUSS DRAWINGS (STAMPED)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LAE PARCEL 6 LOT 98_V2.PDF DOCUMENTS VIEW