Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6464 E PASEO BARANDA
Apply Date:
12/06/2024
Applicant:
Brianna Quiroz
Description:
Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)

Permit Reviews

Permit Number - TC-MDP-1124-01299
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Start Date Submittal Complete Date Status  
08/22/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/25/2025 APPROVED Review Details
12/12/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 12/21/2024 APPROVED Review Details
08/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/19/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-1124-01299
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Date Description Comments
12/16/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/08/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/16/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/08/2024 Post-Tension Inspection Report is required.
11/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
12/16/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
12/16/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01299
Permite Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
02/21/2025 COT - BULD - SWG Clearance N/A Not Applicable n/a
02/21/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable n/a
09/04/2025 COT - RSEL - Electrical Final N/A Re-inspection required 9.4.2025
Hot water heater in garage not connected.
09/04/2025 RSBU - Building Final N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01299
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Total Completed Inspections - 17
Date Description Inspector Results Comments
02/21/2025 COT - RSPL - Sewer Passed 2/21/25 pass
02/21/2025 COT - RSPL - Yard Water Line Passed 2/21/25 pass
02/24/2025 COT - RSPL - Rough Soil Passed
02/28/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
02/28/2025 COT - RSBU - Preslab Passed 28 FEB 25
Pass
02/28/2025 COT - RSEL - Electrical Underground Passed
04/03/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/03/2025 COT - RSBU - Roof Nailing Passed
04/21/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO 4/21/25
04/21/2025 COT - RSEL - Grounding/Bonding Passed Ready for temp power CLEARANCE ECO 4/21/25
04/25/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4-25-25, intermediates approved. Okay to continue with construction.
05/12/2025 COT - RSBU - Interior Shear Bracing Passed Passed 5/12/25 ok to tape
09/04/2025 COT - RSEL - Outdoor Lighting Passed
09/04/2025 COT - RSME - Mechanical Final Passed
09/04/2025 COT - RSPL - Plumbing Final Passed
09/04/2025 ENGR Engineering Final Passed Site is safe and built in accordance with approved plans.
09/04/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 104 FINAL SIC-2025-08-19_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 104 PRE SIC-2024-12-06_V1.PDF DOCUMENTS VIEW
LAE PARCEL 6 LOT 104_V1.PDF DOCUMENTS VIEW