Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6485 E PASEO BARANDA
Apply Date:
11/19/2024
Applicant:
Brianna Quiroz
Description:
SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)

Permit Reviews

Permit Number - TC-MDP-1124-01297
Permit Status: Complete
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)
Start Date Submittal Complete Date Status  
07/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/16/2025 APPROVED Review Details
07/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/03/2025 REQUIRES RESUBMIT Review Details
11/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/09/2024 REQUIRES RESUBMIT Review Details
12/09/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 12/13/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1124-01297
Permit Status: Complete
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)
Date Description Comments
11/27/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/08/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/03/2025 Post-Installed Anchor Inspection Report is required.
11/27/2024 Post-Tension Inspection Report is required.
11/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/27/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
12/09/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01297
Permite Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/23/2025 COT - BULD - SWG Clearance N/A Not Applicable
01/23/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01297
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)
Total Completed Inspections - 19
Date Description Inspector Results Comments
01/23/2025 COT - RSPL - Rough Soil Passed 1/23/25 pass ok to backfill and shade.
01/23/2025 COT - RSPL - Sewer Passed 1/23/25 pass ok to backfill and shade.
01/23/2025 COT - RSPL - Yard Water Line Passed 1/23/25 pass ok to backfill and shade.
01/30/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1/30/25 pass
01/30/2025 COT - RSBU - Preslab Passed 1/30/25 pass
01/30/2025 COT - RSEL - Electrical Underground Passed 1/30/25 pass
02/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
02/27/2025 COT - RSBU - Roof Nailing Passed
03/24/2025 BULD - Electrical Clearance Passed 3/24/25 passed CLEARANCE ECO
03/24/2025 COT - RSEL - Grounding/Bonding Passed 3/24/25 passed CLEARANCE ECO
04/01/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/14/2025 COT - RSBU - Interior Shear Bracing Passed
07/25/2025 COT - RSEL - Electrical Final Passed
07/25/2025 COT - RSEL - Outdoor Lighting Passed
07/25/2025 COT - RSME - Mechanical Final Passed
07/25/2025 COT - RSPL - Plumbing Final Passed
07/25/2025 RSBU - Building Final Passed
07/25/2025 RSBU - Building Progress Passed
08/04/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 60 FINAL SIC-2025-07-11_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 60 PRE SIC-2024-12-09_V2_V1.PDF DOCUMENTS VIEW
LAE PARCEL 6 LOT 60_V2.PDF DOCUMENTS VIEW