Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6476 E PASEO BARANDA
Apply Date:
11/12/2024
Applicant:
Brianna Quiroz
Description:
Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)

Permit Reviews

Permit Number - TC-MDP-1124-01295
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Start Date Submittal Complete Date Status  
11/15/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 11/24/2024 APPROVED Review Details
06/09/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/09/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1124-01295
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Date Description Comments
11/19/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/08/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/19/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/19/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/08/2024 Post-Tension Inspection Report is required.
11/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/19/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01295
Permite Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
01/15/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable Site does not use gas
01/15/2025 COT - BULD - SWG Clearance N/A Not Applicable Site does not use gas
04/03/2025 COT - RSBU - Interior Shear Bracing N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01295
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Completed Inspections - 18
Date Description Inspector Results Comments
01/15/2025 COT - RSPL - Rough Soil Passed Passed 1/15/25 ok to backfill
01/15/2025 COT - RSPL - Sewer Passed Passed 1/15/25 ok to backfill
01/17/2025 COT - RSEL - Electrical Underground Passed Passed 1/17/25
01/17/2025 COT - RSPL - Yard Water Line Passed Air test held pressure 1/17/25
01/22/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1/22/25 pass
01/22/2025 COT - RSEL - Grounding/Bonding Passed 1/22/25 pass
01/24/2025 COT - RSBU - Preslab Passed 1/24/25 pass
02/18/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 2/18/25 pass
02/18/2025 COT - RSBU - Roof Nailing Passed 2/18/25 pass
03/05/2025 BULD - Electrical Clearance Passed 5 Mar 25
TEP CLEARANCE: ECO
03/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3/24/25 passed
07/07/2025 COT - RSEL - Electrical Final Passed Passed final 7/7/25
07/07/2025 COT - RSEL - Outdoor Lighting Passed Passed final 7/7/25
07/07/2025 COT - RSME - Mechanical Final Passed Passed final 7/7/25
07/07/2025 COT - RSPL - Plumbing Final Passed Passed final 7/7/25
07/07/2025 ENGR Engineering Final Passed
07/07/2025 RSBU - Building Final Passed Passed final 7/7/25
07/07/2025 RSBU - Building Progress Passed Passed final 7/7/25

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 101 FINAL SIC-2025-06-05_V1.PDF DOCUMENTS VIEW
Z370 ROOSEVELT- TRUSS REVIEW LETTER - LAYOUT (STAMPED)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 101 PRE SIC-2024-11-12_V1.PDF DOCUMENTS VIEW
LAE PARCEL 6 LOT 101_V1.PDF DOCUMENTS VIEW