Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1124-01290
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4695 E JULIAN WASH DR
Address NEW:
4695 E JULIAN WASH DR
Apply Date:
11/08/2024
Applicant:
Description:
SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Permit Reviews
Permit Number - TC-MDP-1124-01290
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/15/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/05/2024 | APPROVED |
| 09/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/08/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1124-01290
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
| Date | Description | Comments |
|---|---|---|
| 11/08/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 11/19/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/19/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 11/19/2024 | Post-Tension Inspection Report is required. | |
| 11/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/19/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 11/19/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1124-01290
Permite Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 7.7.25 Shot pins required 6 inch from edge of sole plate throughout on (non load bearing). Install anchor bolts as marked, locations, Anchor bolts required within 12" of edge of exterior sole plates. A35s missing nails in multiple areas. RSP 4s required every other stud-add to marked locations, add h-25 at truss CG48C, loose roof panel on bedroom located on south-side. |
| 07/07/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 7.7.25 Shot pins required 6 inch from edge of sole plate throughout on (non load bearing). Install anchor bolts as marked, locations, Anchor bolts required within 12" of edge of exterior sole plates. A35s missing nails in multiple areas. RSP 4s required every other stud-add to marked locations, add h-25 at truss CG48C, loose roof panel on bedroom located on south-side. |
| 09/15/2025 | RSBU - Building Final | N/A | Not Ready | |
| 09/15/2025 | ENGR Engineering Final | N/A | Not Ready | Street directly in front of driveway is impassable, access to home is prevented. Not ready for inspection, recall when street work is complete. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1124-01290
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2025 | COT - RSPL - Rough Soil | Passed | 6.13.25 Running water observed at bib, tracer wires present, all plumbing verified as per plan. Ok to backfill, proper shading material required. | |
| 06/13/2025 | COT - RSPL - Sewer | Passed | 6.13.25 Running water observed at bib, tracer wires present, all plumbing verified as per plan. Ok to backfill, proper shading material required. | |
| 06/13/2025 | COT - RSPL - Yard Water Line | Passed | 6.13.25 Running water observed at bib, tracer wires present, all plumbing verified as per plan. Ok to backfill, proper shading material required. | |
| 06/23/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/23/2025 | COT - RSBU - Preslab | Passed | ||
| 06/23/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 07/09/2025 | COT - RSBU - Roof Nailing | Passed | 7-9-25: roof nailing approved | |
| 07/10/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 7-10-25: exterior clips/sheathing approved. Okay to continue with construction | |
| 07/17/2025 | BULD - Electrical Clearance | Passed | Passed 7/17/25 CLEARANCE ECO | |
| 07/17/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 7/17/25 | |
| 07/17/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 7/17/25 | |
| 08/01/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/03/2025 | COT - BULD - SWG Clearance | Passed | 9.3.2025 Clearance for SW Gas. |
|
| 09/09/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/09/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/09/2025 | COT - RSME - Mechanical Final | Passed | ||
| 09/15/2025 | RSBU - Building Progress | Passed | ||
| 09/15/2025 | COT - RSEL - Electrical Final | Passed | ||
| 09/18/2025 | COT - RSPL - Plumbing Final | Passed | 9-18-25: plumbing final approved. | |
| 09/18/2025 | RSBU - Building Final | Passed | 9-18-25: building final approved. | |
| 09/30/2025 | ENGR Engineering Final | Passed | Site is clear and accessible, built in accordance with approved plans. |