Permit: TC-MDP-1124-01278
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6001 S FONTANA AV
Address NEW:
6001 S FONTANA AV
Apply Date:
12/17/2024
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037 (Model Master Plan TC-MDP-0123-00341)
Permit Reviews
Permit Number - TC-MDP-1124-01278
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037 (Model Master Plan TC-MDP-0123-00341)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/21/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 01/22/2025 | APPROVED |
| 12/23/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 01/17/2025 | REQUIRES RESUBMIT |
| 01/22/2025 | RESTAMP - RESIDENTIAL v.1 | 01/28/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1124-01278
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037 (Model Master Plan TC-MDP-0123-00341)
| Date | Description | Comments |
|---|---|---|
| 11/01/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 11/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1124-01278
Permite Description: DUPLEX DUPLVAL82 T22-M0037 (Model Master Plan TC-MDP-0123-00341)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2025 | COT - RSPL - Rough Soil | N/A | Re-inspection required | Sink at first complex empty, must be fully under test |
| 02/07/2025 | COT - RSPL - Yard Water Line | N/A | Re-inspection required | Water line at 2nd apartment has a leak |
| 05/06/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 5-6-25, not applicable. |
| 05/06/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 5-6-25, not applicable. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1124-01278
Permit Description: DUPLEX DUPLVAL82 T22-M0037 (Model Master Plan TC-MDP-0123-00341)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2025 | COT - RSPL - Sewer | Passed | Sewer connection and clean outs per plan | |
| 02/10/2025 | COT - RSPL - Rough Soil | Passed | 2/10/25 corrections made, ok to backfill | |
| 02/10/2025 | COT - RSPL - Yard Water Line | Passed | 2/10/25 corrections made, ok to backfill | |
| 02/11/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 2/11/25 ok to pour concrete | |
| 02/11/2025 | COT - RSBU - Preslab | Passed | Passed 2/11/25 ok to pour concrete | |
| 03/10/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/10/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 03/12/2025 | BULD - Electrical Clearance | Passed | Passed 3/12/25 CLEARANCE ECO | |
| 03/12/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 3/12/25 ok to drywall | |
| 03/12/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed 3/12/25 ok to drywall | |
| 05/05/2025 | ENGR Engineering Final | Passed | CO READY | |
| 05/06/2025 | COT - RSBU - Interior Shear Bracing | Passed | 5-6-25 previously inspected and approved. | |
| 05/06/2025 | COT - RSEL - Electrical Final | Passed | 5-6-25, electrical final approved. | |
| 05/06/2025 | COT - RSEL - Electrical Underground | Passed | 5-6-25, previously inspected and approved. | |
| 05/06/2025 | COT - RSEL - Outdoor Lighting | Passed | 5-6-25, outdoor lighting approved. | |
| 05/06/2025 | COT - RSPL - Plumbing Final | Passed | 5-6-25, plumbing final approved. | |
| 05/06/2025 | RSBU - Building Progress | Passed | ||
| 05/09/2025 | RSBU - Building Final | Passed | 5-9-25, mechanical & building final approved. | |
| 05/09/2025 | COT - RSME - Mechanical Final | Passed | 5-9-25, mechanical & building final approved. |