Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
11/04/2024
Applicant:
Helen Ormsby
Description:
Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)

Permit Reviews

Permit Number - TC-MDP-1124-01274
Permit Status: Issued
Permit Description: Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)
Start Date Submittal Complete Date Status  
12/02/2024 SITE FROM MODEL PERMIT - PRODUCTION REVISION v.1 12/17/2024 APPROVED Review Details
11/07/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/19/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1124-01274
Permit Status: Issued
Permit Description: Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)
Total Outstanding Activity Conditions - 5
Date Name
11/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/07/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/07/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/07/2024 Post-Tension Inspection Report is required.
11/07/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-1124-01274
Permit Status: Issued
Permit Description: Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)
Date Description Comments
11/01/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/07/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-1124-01274
Permite Description: Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Scheduled
COT - RSPL - Gas Pressure Test N/A Scheduled

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-1124-01274
Permit Description: Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)
Total Completed Inspections - 10
Date Description Inspector Results Comments
12/04/2024 COT - RSPL - Rough Soil Passed 12-4-24, main water line and underground plumbing verified as per approved plans. Okay to backfill.
12/04/2024 COT - RSPL - Sewer Passed 12-4-24, sewer connection verified as per approved plans. Okay to backfill.
12/04/2024 COT - RSPL - Yard Water Line Passed 12-4-24, main water line and underground plumbing verified as per approved plans. Okay to backfill.
12/10/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Footings, rebar, and grounding per plan, underground electric present 12/10/24
12/10/2024 COT - RSBU - Preslab Passed Footings, rebar, and grounding per plan, underground electric present 12/10/24
12/10/2024 COT - RSEL - Electrical Underground Passed Footings, rebar, and grounding per plan, underground electric present 12/10/24
12/10/2024 COT - RSEL - Grounding/Bonding Passed Footings, rebar, and grounding per plan, underground electric present 12/10/24
12/10/2024 BULD - Electrical Clearance Passed Grounded, temp receptacle and breakers present, ready for temp power 12/10/24 CLEARANCE ECO
01/02/2025 COT - RSBU - Exterior Clips/Sheathing Passed 1/2/25 corrections made
01/02/2025 COT - RSBU - Roof Nailing Passed 1/2/25 corrections made

Scheduled Inspections

Scheduled Inspections - TC-MDP-1124-01274
Status: Issued
Description: Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 106 REV1 D1_V1.PDF DOCUMENTS VIEW
BHK 106 REV1 NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 106 SIC-2024-11-04_V1.PDF DOCUMENTS VIEW
CONS-BHK 106 D1_V1.PDF DOCUMENTS VIEW