Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
11/01/2024
Applicant:
Description:
SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.

Permit Reviews

Permit Number - TC-MDP-1124-01273
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Start Date Submittal Complete Date Status  
11/05/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/22/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1124-01273
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Outstanding Activity Conditions - 6
Date Name
11/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/06/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/06/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/06/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/06/2024 Post-Tension Inspection Report is required.
11/06/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-1124-01273
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Date Description Comments
11/01/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/06/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1124-01273
Permite Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/26/2024 COT - RSEL - Grounding/Bonding N/A Partial Pass 12-26-24, partial pass-ufer in place.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1124-01273
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Completed Inspections - 21
Date Description Inspector Results Comments
12/16/2024 COT - RSPL - Rough Soil Passed 12-16-24, underground plumbing, sewer connection, and main water line inspections were all verified as per approved plans. Okay to backfill with shading materials.
12/16/2024 COT - RSPL - Sewer Passed 12-16-24, underground plumbing, sewer connection, and main water line inspections were all verified as per approved plans. Okay to backfill with shading materials.
12/16/2024 COT - RSPL - Yard Water Line Passed 12-16-24, underground plumbing, sewer connection, and main water line inspections were all verified as per approved plans. Okay to backfill with shading materials.
12/26/2024 COT - RSBU - Preslab Passed 12-26-24, preslab inspection per approved plans. Okay to pour concrete.
12/26/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 12-26-24, excavation and setbacks verified as per approved plans. Okay to pour concrete.
12/26/2024 COT - RSEL - Electrical Underground Passed 12-26-24, electric underground conduit wrapped.
01/14/2025 COT - RSBU - Roof Nailing Passed 1-14-25,okay to dry in roof
01/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1-16-25, approved. Okay to continue with construction
02/07/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO 2/7/25
02/07/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 2/7/25 ok to drywall
02/07/2025 COT - RSPL - Gas Pressure Test Passed Held pressure 2/7/25
02/20/2025 COT - RSEL - Grounding/Bonding Passed 2/19/25 pass
02/20/2025 COT - RSBU - Interior Shear Bracing Passed 2/19/25 pass
04/08/2025 COT - BULD - SWG Clearance Passed 3 April 25
Southwest Gas Clearance: SWG
04/09/2025 COT - RSEL - Electrical Final Passed 4-9-25, electrical final approved.
04/09/2025 COT - RSEL - Outdoor Lighting Passed 4-9-25, outdoor lighting approved.
04/09/2025 COT - RSME - Mechanical Final Passed 4-9-25, mechanical final approved.
04/09/2025 ENGR Engineering Final Passed CO READY
04/09/2025 RSBU - Building Progress Passed
04/16/2025 COT - RSPL - Plumbing Final Passed 4/16/25
All plastics have been painted.
04/16/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-11-01_V1.PDF DOCUMENTS VIEW