Permit: TC-MDP-1124-01272
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
10136 S ARNOLD RANCH CT
Address NEW:
10136 S ARNOLD RANCH CT
Apply Date:
10/28/2024
Applicant:
Brandon Kempel
Description:
SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Permit Reviews
Permit Number - TC-MDP-1124-01272
Permit Status: Inspections
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/12/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/24/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1124-01272
Permit Status: Inspections
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 02/14/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 02/14/2025 | Post-Installed Anchor Inspection Report is required. |
| 02/14/2025 | Post-Tension Inspection Report is required. |
| 11/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-1124-01272
Permit Status: Inspections
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
| Date | Description | Comments |
|---|---|---|
| 11/01/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 11/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1124-01272
Permite Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2025 | ENGR Engineering Final | N/A | Partial Pass |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1124-01272
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/20/2025 | COT - RSPL - Rough Soil | Passed | 3-20-25, underground plumbing approved. Okay to backfill-provide shading. | |
| 03/20/2025 | COT - RSPL - Sewer | Passed | 3-20-25, main water line, sewer connection, and underground plumbing approved. Okay to backfill-provide shading. | |
| 03/20/2025 | COT - RSPL - Yard Water Line | Passed | 3-20-25, main water line, sewer connection, and underground plumbing approved. Okay to backfill-provide shading. | |
| 03/28/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 03/28/2025 | COT - RSBU - Preslab | Passed | ||
| 03/28/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 04/17/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/17/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 05/05/2025 | COT - RSEL - Grounding/Bonding | Passed | 5/5/25 passed | |
| 05/05/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 5/5/25 | |
| 05/05/2025 | COT - RSPL - Gas Pressure Test | Passed | 5/5/25 passed | |
| 05/12/2025 | BULD - Electrical Clearance | Passed | 05/12/25 TEP CLEARANCE:ECO |
|
| 05/16/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/26/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 6/26/25 | |
| 07/14/2025 | COT - RSEL - Electrical Final | Passed | 7.14.25 All receptacles are per plan and up to code. Firedoor at garage verified, thermostat height verified. Breaker schedule verified. No open unused areas at panel. Lines secured. AAV at island. Attic unit supported and installed per code. Max breaker for AC verified correct. Hammer arrestors verified. |
|
| 07/14/2025 | COT - RSEL - Outdoor Lighting | Passed | 7.14.25 All receptacles are per plan and up to code. Firedoor at garage verified, thermostat height verified. Breaker schedule verified. No open unused areas at panel. Lines secured. AAV at island. Attic unit supported and installed per code. Max breaker for AC verified correct. Hammer arrestors verified. |
|
| 07/14/2025 | COT - RSME - Mechanical Final | Passed | 7.14.25 All receptacles are per plan and up to code. Firedoor at garage verified, thermostat height verified. Breaker schedule verified. No open unused areas at panel. Lines secured. AAV at island. Attic unit supported and installed per code. Max breaker for AC verified correct. Hammer arrestors verified. |
|
| 07/14/2025 | COT - RSPL - Plumbing Final | Passed | 7.14.25 All receptacles are per plan and up to code. Firedoor at garage verified, thermostat height verified. Breaker schedule verified. No open unused areas at panel. Lines secured. AAV at island. Attic unit supported and installed per code. Max breaker for AC verified correct. Hammer arrestors verified. |
|
| 07/14/2025 | RSBU - Building Final | Passed | 7.14.25 All receptacles are per plan and up to code. Firedoor at garage verified, thermostat height verified. Breaker schedule verified. No open unused areas at panel. Lines secured. AAV at island. Attic unit supported and installed per code. Max breaker for AC verified correct. Hammer arrestors verified. |