Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
10/28/2024
Applicant:
Brandon Kempel
Description:
SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.

Permit Reviews

Permit Number - TC-MDP-1124-01270
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Start Date Submittal Complete Date Status  
01/22/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/31/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1124-01270
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Outstanding Activity Conditions - 5
Date Name
01/22/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/22/2025 Post-Installed Anchor Inspection Report is required.
01/22/2025 Post-Tension Inspection Report is required.
01/22/2025 Soils Special Inspection is Required
11/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1124-01270
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Date Description Comments
11/01/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1124-01270
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/27/2025 COT - RSPL - Rough Soil Passed
02/27/2025 COT - RSPL - Sewer Passed
02/27/2025 COT - RSPL - Yard Water Line Passed
03/06/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 6 March 23
Pass
03/06/2025 COT - RSBU - Preslab Passed 6 March 25
Pass
03/06/2025 COT - RSEL - Electrical Underground Passed
03/24/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 3-24-25, exterior clips.sheathing inspection approved. Okay to continue with construction.
03/24/2025 COT - RSBU - Roof Nailing Passed 3-24-25, roof nailing & exterior clips sheathing inspection approved. Okay to continue with construction.
04/07/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/07/2025 BULD - Electrical Clearance Passed 7 April 25
TEP CLEARANCE: ECO
04/07/2025 COT - RSPL - Gas Pressure Test Passed
04/18/2025 COT - RSEL - Grounding/Bonding Passed
04/18/2025 COT - RSBU - Interior Shear Bracing Passed
05/27/2025 COT - BULD - SWG Clearance Passed 5/27/25
SOUTHWEST GAS CLEARANCE: SWG
05/30/2025 ENGR Engineering Final Passed
06/04/2025 COT - RSEL - Electrical Final Passed 6/4/25
Pass
06/04/2025 COT - RSEL - Outdoor Lighting Passed 6/4/25
Pass
06/04/2025 COT - RSME - Mechanical Final Passed 6/4/25
Pass
06/04/2025 COT - RSPL - Plumbing Final Passed
06/04/2025 RSBU - Building Final Passed 6/4/25
Pass
06/04/2025 RSBU - Building Progress Passed 6/4/25
Pass

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-01-21_V1.PDF DOCUMENTS VIEW