Permit Number - TC-MDP-1124-01266
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Start Date Submittal Complete Date Status  
05/16/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/19/2025 APPROVED Review Details
12/12/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/20/2024 APPROVED Review Details
01/30/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/03/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1124-01266
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Date Description Comments
12/12/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/01/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/12/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/12/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
05/16/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01266
Permite Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
03/25/2025 COT - RSEL - Electrical Underground N/A Partial Pass 25 March 25
Pass
03/25/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 25 March 25
Partial for Ufer.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1124-01266
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506)
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/13/2025 COT - RSPL - Sewer Passed 3/13/25: plumbing underground and HCS connection per plans ok to proceed with backfill. Shading required
03/13/2025 COT - RSPL - Yard Water Line Passed 3/13/25: plumbing underground and HCS connection per plans ok to proceed with backfill. Shading required
03/13/2025 COT - RSPL - Rough Soil Passed 3/13/25: plumbing underground and HCS connection per plans ok to proceed with backfill. Shading required
03/25/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
03/25/2025 COT - RSBU - Preslab Passed
04/02/2025 COT - RSEL - Electrical Underground Passed
04/03/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Passed 4/3/25 ok to proceed to intermediate stage
04/02/2025 COT - RSBU - Roof Nailing Passed Passed 4/2/25
04/25/2025 COT - RSEL - Grounding/Bonding Passed Passed 4/25/25
04/25/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 4/25/25
04/25/2025 COT - RSPL - Gas Pressure Test Passed Passed 4/25/25
04/28/2025 BULD - Electrical Clearance Passed ECO
05/05/2025 RSBU - Building Progress Passed Lath
05/05/2025 COT - RSBU - Interior Shear Bracing Passed
06/23/2025 COT - BULD - SWG Clearance Passed Passed 6/18/25 CLEARANCE SWG
06/24/2025 COT - RSEL - Outdoor Lighting Passed 6-24-25: outdoor lighting approved
06/24/2025 COT - RSEL - Electrical Final Passed 6-24-25: electrical final approved
06/24/2025 COT - RSME - Mechanical Final Passed 6-24-25: mechanical final approved
06/24/2025 COT - RSPL - Plumbing Final Passed 6-24-25: plumbing final approved
06/24/2025 RSBU - Building Final Passed 6-24-25: building final approved
06/30/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
242218 - HOUGHTON RESERVE PH 2 - LOT 156 - PT-2025-05-15_V1.PDF DOCUMENTS VIEW
LOT 156 SPECIAL INSPECTION CERTIFICATE REVISED-2025-01-28_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 156 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 156 SPECIAL INSPECTION CERTIFICATE-2024-12-05_V1.PDF DOCUMENTS VIEW