Permit Reviews
Permit Number - TC-MDP-1123-01849
Permit Status: Inspections complete
Permit Description: SFR K35L T21-M0035
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/01/2024 | APPROVED |
| 12/18/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 12/26/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1123-01849
Permit Status: Inspections complete
Permit Description: SFR K35L T21-M0035
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/27/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 03/27/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 03/27/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-1123-01849
Permit Status: Inspections complete
Permit Description: SFR K35L T21-M0035
| Date | Description | Comments |
|---|---|---|
| 11/28/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/27/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01849
Permit Description: SFR K35L T21-M0035
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2024 | COT - RSPL - Backwater Valve | Passed | Canceled per contractor. 3/18/2024 3/19/24: passed ok to backfill. Shading required |
|
| 03/19/2024 | COT - RSPL - Rough Soil | Passed | Canceled per contractor. 3/18/2024 3/19/24: passed ok to backfill. Shading required |
|
| 03/19/2024 | COT - RSPL - Sewer | Passed | Canceled per contractor. 3/18/2024 3/19/24: passed ok to backfill. Shading required |
|
| 03/19/2024 | COT - RSPL - Yard Water Line | Passed | Canceled per contractor. 3/18/2024 3/19/24: passed ok to backfill. Shading required |
|
| 03/27/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 03/27/2024 | COT - RSBU - Preslab | Passed | ||
| 03/27/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 03/27/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/22/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/22/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 05/09/2024 | BULD - Electrical Clearance | Passed | ||
| 05/09/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 05/09/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 05/23/2024 | COT - RSBU - Interior Shear Bracing | Passed | 5/20/24: canceled per Gonzalo 5/21/24: fasteners not per schedule throughout, fasteners shall be no less than3/8" from edge, fasteners missing throughout at bottom plate and edges. 5/22/24: per previous notes 5/23/24: corrections made |
|
| 07/12/2024 | COT - BULD - SWG Clearance | Passed | ||
| 07/24/2024 | ENGR Engineering Final | Passed | ||
| 07/24/2024 | RSBU - Building Progress | Passed | ||
| 07/25/2024 | COT - RSEL - Electrical Final | Passed | ||
| 07/25/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/25/2024 | COT - RSME - Mechanical Final | Passed | ||
| 07/25/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 07/25/2024 | RSBU - Building Final | Passed |