Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
2375 W OWL PERCH LP
Apply Date:
12/18/2023
Applicant:
Description:
SFR K35L T21-M0035

Permit Reviews

Permit Number - TC-MDP-1123-01849
Permit Status: Inspections complete
Permit Description: SFR K35L T21-M0035
Start Date Submittal Complete Date Status  
03/27/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/01/2024 APPROVED Review Details
12/18/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 12/26/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01849
Permit Status: Inspections complete
Permit Description: SFR K35L T21-M0035
Total Outstanding Activity Conditions - 3
Date Name
03/27/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/27/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/27/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-1123-01849
Permit Status: Inspections complete
Permit Description: SFR K35L T21-M0035
Date Description Comments
11/28/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/27/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01849
Permit Description: SFR K35L T21-M0035
Total Completed Inspections - 22
Date Description Inspector Results Comments
03/19/2024 COT - RSPL - Backwater Valve Passed Canceled per contractor. 3/18/2024
3/19/24: passed ok to backfill. Shading required
03/19/2024 COT - RSPL - Rough Soil Passed Canceled per contractor. 3/18/2024
3/19/24: passed ok to backfill. Shading required
03/19/2024 COT - RSPL - Sewer Passed Canceled per contractor. 3/18/2024
3/19/24: passed ok to backfill. Shading required
03/19/2024 COT - RSPL - Yard Water Line Passed Canceled per contractor. 3/18/2024
3/19/24: passed ok to backfill. Shading required
03/27/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
03/27/2024 COT - RSBU - Preslab Passed
03/27/2024 COT - RSEL - Electrical Underground Passed
03/27/2024 COT - RSEL - Grounding/Bonding Passed
04/22/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/22/2024 COT - RSBU - Roof Nailing Passed
05/09/2024 BULD - Electrical Clearance Passed
05/09/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/09/2024 COT - RSPL - Gas Pressure Test Passed
05/23/2024 COT - RSBU - Interior Shear Bracing Passed 5/20/24: canceled per Gonzalo
5/21/24: fasteners not per schedule throughout, fasteners shall be no less than3/8" from edge, fasteners missing throughout at bottom plate and edges.
5/22/24: per previous notes
5/23/24: corrections made
07/12/2024 COT - BULD - SWG Clearance Passed
07/24/2024 ENGR Engineering Final Passed
07/24/2024 RSBU - Building Progress Passed
07/25/2024 COT - RSEL - Electrical Final Passed
07/25/2024 COT - RSEL - Outdoor Lighting Passed
07/25/2024 COT - RSME - Mechanical Final Passed
07/25/2024 COT - RSPL - Plumbing Final Passed
07/25/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
K35L APPROVED TRUSS CALCS 10-18-22 - ALLIANCE TRUSS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECICAL INSPECTION CERT-2023-12-18_V1.PDF DOCUMENTS VIEW
1_WASTEWATER PERMIT_V1.PDF DOCUMENTS VIEW