Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
2493 W ROCK HOUSE LN
Apply Date:
11/28/2023
Applicant:
Description:
SFR K35L T21-M0035

Permit Reviews

Permit Number - TC-MDP-1123-01848
Permit Status: Inspections complete
Permit Description: SFR K35L T21-M0035
Start Date Submittal Complete Date Status  
11/29/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 12/04/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01848
Permit Status: Inspections complete
Permit Description: SFR K35L T21-M0035
Total Outstanding Activity Conditions - 4
Date Name
11/29/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/29/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/29/2023 Post-Tension Inspection Report is required.
11/29/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-1123-01848
Permit Status: Inspections complete
Permit Description: SFR K35L T21-M0035
Date Description Comments
11/28/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01848
Permite Description: SFR K35L T21-M0035
Total Outstanding Inspections - 1

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01848
Permit Description: SFR K35L T21-M0035
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/11/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 1/11/2024
01/11/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 1/11/2024
01/11/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 1/11/2024
01/19/2024 COT - RSEL - Electrical Underground Passed
01/19/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
01/19/2024 COT - RSBU - Preslab Passed
01/19/2024 COT - RSEL - Grounding/Bonding Passed
02/06/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
02/06/2024 COT - RSBU - Roof Nailing Passed
02/26/2024 COT - RSPL - Gas Pressure Test Passed
02/26/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 2/26/2024
02/28/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/08/2024 COT - RSBU - Interior Shear Bracing Passed
04/18/2024 COT - BULD - SWG Clearance Passed 4/18/24: SWG CLEARANCE meter tag
05/02/2024 COT - RSEL - Outdoor Lighting Passed
05/02/2024 COT - RSME - Mechanical Final Passed
05/02/2024 COT - RSPL - Plumbing Final Passed
05/02/2024 RSBU - Building Progress Passed
05/02/2024 ENGR Engineering Final Passed
05/06/2024 COT - RSEL - Electrical Final Passed
05/06/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT.-2023-11-28_V1.PDF DOCUMENTS VIEW