Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
11/28/2023
Applicant:
Brandon Kempel
Description:
SFR RKK35G T21-M0090

Permit Reviews

Permit Number - TC-MDP-1123-01842
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Start Date Submittal Complete Date Status  
11/29/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/04/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01842
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Total Outstanding Activity Conditions - 6
Date Name
11/29/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/29/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/29/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/29/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
12/01/2023 Post-Tension Inspection Report is required.
12/01/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-1123-01842
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Date Description Comments
11/28/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01842
Permite Description: SFR RKK35G T21-M0090
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/23/2024 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01842
Permit Description: SFR RKK35G T21-M0090
Total Completed Inspections - 20
Date Description Inspector Results Comments
01/19/2024 COT - RSPL - Rough Soil Passed
01/19/2024 COT - RSPL - Sewer Passed
01/19/2024 COT - RSPL - Yard Water Line Passed
01/31/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
01/31/2024 COT - RSBU - Preslab Passed
01/31/2024 COT - RSEL - Electrical Underground Passed
02/16/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
02/16/2024 COT - RSBU - Roof Nailing Passed
02/28/2024 BULD - Electrical Clearance Passed TEP ECO
02/28/2024 COT - RSEL - Grounding/Bonding Passed
03/04/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/15/2024 COT - RSBU - Interior Shear Bracing Passed Interior shear walls throughout building are properly installed and screwed off. Okay to proceed with tape and texture of walls.
04/23/2024 COT - BULD - SWG Clearance Passed
04/23/2024 COT - RSPL - Gas Pressure Test Passed
05/03/2024 COT - RSEL - Electrical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, with GFCI & AFCI breakers installed and fully functional. Kitchen stove/oven has the anti-tip device installed. Outside lighting is properly installed and meets plan requirements. Okay to issue Certificate of Occupancy for this permit.
05/03/2024 COT - RSME - Mechanical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, with GFCI & AFCI breakers installed and fully functional. Kitchen stove/oven has the anti-tip device installed. Outside lighting is properly installed and meets plan requirements. Okay to issue Certificate of Occupancy for this permit.
05/03/2024 COT - RSEL - Outdoor Lighting Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, with GFCI & AFCI breakers installed and fully functional. Kitchen stove/oven has the anti-tip device installed. Outside lighting is properly installed and meets plan requirements. Okay to issue Certificate of Occupancy for this permit.
05/03/2024 COT - RSPL - Plumbing Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, with GFCI & AFCI breakers installed and fully functional. Kitchen stove/oven has the anti-tip device installed. Outside lighting is properly installed and meets plan requirements. Okay to issue Certificate of Occupancy for this permit.
05/03/2024 RSBU - Building Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, with GFCI & AFCI breakers installed and fully functional. Kitchen stove/oven has the anti-tip device installed. Outside lighting is properly installed and meets plan requirements. Okay to issue Certificate of Occupancy for this permit.
05/03/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-11-28_V1.PDF DOCUMENTS VIEW