Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
12/01/2023
Applicant:
Daniel Hutcherson
Description:
RPA ADU - TC-MDP-0823-01460

Permit Reviews

Permit Number - TC-MDP-1123-01840
Permit Status: Inspections complete
Permit Description: RPA ADU - TC-MDP-0823-01460
Start Date Submittal Complete Date Status  
08/29/2024 SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.2 08/29/2024 APPROVED Review Details
07/24/2024 SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.1 07/24/2024 REQUIRES RESUBMIT Review Details
12/01/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 12/07/2023 APPROVED Review Details
07/10/2024 MODEL PERMIT TEMPLATE REVIEW RESIDENTIAL v.1 07/15/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01840
Permit Status: Inspections complete
Permit Description: RPA ADU - TC-MDP-0823-01460
Total Outstanding Activity Conditions - 3
Date Name
09/14/2023 Floor Truss Designs must be submitted and approved prior to ...
09/14/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
09/14/2023 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-MDP-1123-01840
Permit Status: Inspections complete
Permit Description: RPA ADU - TC-MDP-0823-01460
Date Description Comments
12/01/2023 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
12/07/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01840
Permite Description: RPA ADU - TC-MDP-0823-01460
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
11/21/2024 COT - RSBU - Preslab N/A Partial Pass ok to place concrete for stemwall
04/14/2025 RSBU - Building Progress N/A Not Applicable
04/16/2025 COT - BULD - SWG Clearance N/A Not Applicable
04/16/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
12/09/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready Observed stub in for sewer and water.
04/14/2025 COT - RSEL - Outdoor Lighting N/A Partial Pass

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01840
Permit Description: RPA ADU - TC-MDP-0823-01460
Total Completed Inspections - 19
Date Description Inspector Results Comments
03/13/2024 COT - RSPL - Rough Soil Passed "Partial for main waterline OK to cover" - WAYNE GALLAGHER *PLEASE NOTE THIS RESULT WAS TRANSFFERED OVER FROM TEMPLATE TC-MDP-0823-01460* Inspection number: RSPL-024629-2024
08/30/2024 BULD - Electrical Clearance Passed
09/23/2024 COT - RSEL - Electrical Underground Passed
03/14/2025 COT - RSBU - Roof Nailing Passed
03/14/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/14/2025 PDSD Building Division - Unspecified In-Field Passed
04/11/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
04/11/2025 COT - RSBU - Preslab Passed
04/11/2025 COT - RSPL - Sewer Passed
04/16/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/25/2025 COT - RSBU - Interior Shear Bracing Passed
08/29/2025 COT - RSEL - Electrical Final Passed
08/29/2025 COT - RSEL - Grounding/Bonding Passed
08/29/2025 COT - RSME - Mechanical Final Passed
08/29/2025 COT - RSPL - Plumbing Final Passed
08/29/2025 RSBU - Building Final Passed
08/29/2025 COT - RSPL - Yard Water Line Passed
08/29/2025 ENGR Engineering Final Passed Accessory Dwelling Unit is complete in accordance with approved plans.
08/29/2025 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
AS1.0 ARCHITECTURAL SITE PLAN_V1.PDF DOCUMENTS VIEW