Permit: TC-MDP-1123-01838
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
6697 E VIA DE AYATE
Address NEW:
6697 E VIA DE AYATE
Apply Date:
01/23/2024
Applicant:
Craig Morczynski
Description:
SFR LENNLE4001 T22-M0045
Permit Reviews
Permit Number - TC-MDP-1123-01838
Permit Status: Inspections
Permit Description: SFR LENNLE4001 T22-M0045
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/23/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 01/29/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1123-01838
Permit Status: Inspections
Permit Description: SFR LENNLE4001 T22-M0045
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 01/23/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 01/23/2024 | Post-Installed Anchor Inspection Report is required. |
| 01/23/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 01/26/2024 | Post-Tension Inspection Report is required. |
| 01/26/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 07/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
| 07/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-1123-01838
Permit Status: Inspections
Permit Description: SFR LENNLE4001 T22-M0045
| Date | Description | Comments |
|---|---|---|
| 11/27/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1123-01838
Permite Description: SFR LENNLE4001 T22-M0045
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2024 | COT - RSEL - Electrical Final | N/A | Partial Pass | |
| 09/13/2024 | COT - RSPL - Plumbing Final | N/A | Partial Pass | Insulate copper lines at water heater. Provide 3"clearance from earth for condenser . 9/13/2024 |
| 09/13/2024 | RSBU - Building Final | N/A | Partial Pass | Per other notes. Proved ladder for attic access. 9/13/2024 |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1123-01838
Permit Description: SFR LENNLE4001 T22-M0045
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2024 | COT - RSPL - Rough Soil | Passed | 3/11/24: Underground plumbing is connected to main sewer line and under a 10' water test with no leaks in the pipes. Okay to shade pipes and backfill trenches. | |
| 03/11/2024 | COT - RSPL - Sewer | Passed | 3/11/24: Underground plumbing is connected to main sewer line and under a 10' water test with no leaks in the pipes. Okay to shade pipes and backfill trenches. | |
| 03/11/2024 | COT - RSPL - Yard Water Line | Passed | 3/11/24: Main water is connected to the water meter and under street pressure with no leaks. Okay to shade pipe and backfill trenches. | |
| 03/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Missing masa clips | |
| 03/25/2024 | COT - RSEL - Electrical Underground | Passed | Missing masa clips | |
| 03/25/2024 | COT - RSBU - Preslab | Passed | Missing masa clips | |
| 03/25/2024 | COT - RSEL - Grounding/Bonding | Passed | Missing masa clips | |
| 04/12/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 05/02/2024 | BULD - Electrical Clearance | Passed | ||
| 05/03/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/17/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 06/17/2024 | RSBU - Building Progress | Passed | ||
| 06/24/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/05/2024 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 9/5/2024 | |
| 09/13/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/13/2024 | COT - RSME - Mechanical Final | Passed | ||
| 09/12/2024 | ENGR Engineering Final | Passed | Move in ready | |
| 09/16/2024 | COT - RSEL - Electrical Final | Passed | ||
| 09/16/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 09/16/2024 | RSBU - Building Final | Passed |