Permit: TC-MDP-1123-01819
Permit Details
Apply Date:
02/13/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130
Permit Reviews
Permit Number - TC-MDP-1123-01819
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/14/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/26/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1123-01819
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
01/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
02/14/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
02/14/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
08/23/2023 | Post-Tension Inspection Report is required. |
08/23/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-1123-01819
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Date | Description | Comments |
---|---|---|
01/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01819
Permite Description: Bella Tierra Phase 3 1745-130
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/05/2024 | COT - RSEL - Electrical Underground | N/A | Not Applicable | Not required on this model, kitchen has a peninsula not an island. |
05/08/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | Missing a/b bolts in 5 different places on shear walls throughout house. |
10/10/2024 | RSBU - Building Progress | N/A | Not Applicable | |
10/10/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 10/10/24 no clean outs at exterior, master bedroom closest switch not fastened, toilets need to be caulked, no ladder provided for crawl space. |
10/10/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 10/10/24 no clean outs at exterior, master bedroom closest switch not fastened, toilets need to be caulked, no ladder provided for crawl space. |
10/10/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 10/10/24 no clean outs at exterior, master bedroom closest switch not fastened, toilets need to be caulked, no ladder provided for crawl space. |
10/10/2024 | RSBU - Building Final | N/A | Re-inspection required | 10/10/24 no clean outs at exterior, master bedroom closest switch not fastened, toilets need to be caulked, no ladder provided for crawl space. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01819
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/19/2024 | COT - RSPL - Yard Water Line | Passed | ||
04/05/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are in place, post tension cabling is properly installed per plans, rebar reinforcement is installed where required by the plan, Ufer ground rebar is attached to bottom rebar in footing, and footings are properly dug out and cleaned of debris. | |
04/05/2024 | COT - RSBU - Preslab | Passed | Concrete forms are in place, post tension cabling is properly installed per plans, rebar reinforcement is installed where required by the plan, Ufer ground rebar is attached to bottom rebar in footing, and footings are properly dug out and cleaned of debris. | |
04/05/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are in place, post tension cabling is properly installed per plans, rebar reinforcement is installed where required by the plan, Ufer ground rebar is attached to bottom rebar in footing, and footings are properly dug out and cleaned of debris. | |
05/08/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly installed and secured to top plate with H2.5 clips. Roof sheathing is properly nailed to trusses per code. Okay to proceed with top out of plumbing. | |
05/10/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 5-10-24: Missing A/B bolts have been installed on all shear walls. Okay to proceed. | |
06/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
06/05/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is installed and holding 15# of air pressure with no leaks. Okay to proceed. | |
06/21/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/02/2024 | BULD - Electrical Clearance | Passed | TEP issued an ECO Clearance. Okay to energize panel. | |
08/27/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
09/09/2024 | COT - RSPL - Sewer | Passed | Sewer line is properly connected to underground plumbing. Okay to shade pipe and backfill trench. | |
09/09/2024 | COT - RSPL - Rough Soil | Passed | Sewer line is properly connected to underground plumbing. Okay to shade pipe and backfill trench. | |
10/10/2024 | COT - RSEL - Outdoor Lighting | Passed | 10/10/24 pass | |
10/11/2024 | COT - RSEL - Electrical Final | Passed | 10/11/24: Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/11/2024 | COT - RSME - Mechanical Final | Passed | 10/11/24: Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/11/2024 | COT - RSPL - Plumbing Final | Passed | 10/11/24: Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/11/2024 | RSBU - Building Final | Passed | 10/11/24: Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/11/2024 | ENGR Engineering Final | Passed | fix broken sidewalk |