Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
03/26/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130

Permit Reviews

Permit Number - TC-MDP-1123-01818
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Start Date Submittal Complete Date Status  
03/28/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/04/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01818
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 8
Date Name
03/28/2024 Post-Tension Inspection Report is required.
03/28/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
04/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/23/2023 Post-Tension Inspection Report is required.
08/23/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
11/22/2023 THIS DOES NOT APPLY

Conditions

Permit Number - TC-MDP-1123-01818
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Date Description Comments
08/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 THIS DOES NOT APPLY

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01818
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/30/2024 COT - RSPL - Rough Soil Passed
04/30/2024 COT - RSPL - Yard Water Line Passed
06/04/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/04/2024 COT - RSBU - Preslab Passed
06/04/2024 COT - RSEL - Electrical Underground Passed
06/04/2024 COT - RSEL - Grounding/Bonding Passed
06/21/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/21/2024 COT - RSBU - Roof Nailing Passed
08/08/2024 COT - RSPL - Gas Pressure Test Passed
08/12/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8/12/24: DWV is completely filled with water. Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation.
08/27/2024 COT - RSBU - Interior Shear Bracing Passed
09/16/2024 BULD - Electrical Clearance Passed Passes electrical clearance ECO 9/16/2024
09/19/2024 COT - RSPL - Sewer Passed
10/16/2024 COT - BULD - SWG Clearance Passed Gas equipment and valves are installed. SWG Clearance issued to Southwest Gas Company to install meter and turn on gas.
11/04/2024 COT - RSEL - Electrical Final Passed Construction is complete per plans and code requirements. Okay to issue Certificate of Occupancy.
11/04/2024 COT - RSEL - Outdoor Lighting Passed Construction is complete per plans and code requirements. Okay to issue Certificate of Occupancy.
11/04/2024 COT - RSME - Mechanical Final Passed Construction is complete per plans and code requirements. Okay to issue Certificate of Occupancy.
11/04/2024 COT - RSPL - Plumbing Final Passed Construction is complete per plans and code requirements. Okay to issue Certificate of Occupancy.
11/04/2024 ENGR Engineering Final Passed
11/04/2024 RSBU - Building Final Passed Construction is complete per plans and code requirements. Okay to issue Certificate of Occupancy.
11/04/2024 RSBU - Building Progress Passed Construction is complete per plans and code requirements. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 31 START_V1.PDF DOCUMENTS VIEW
BTIII 31 SIC-2024-03-26_V1.PDF DOCUMENTS VIEW