Permit: TC-MDP-1123-01818
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
4635 S BRANDYWINE DR
Address NEW:
4635 S BRANDYWINE DR
Apply Date:
03/26/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130
Permit Reviews
Permit Number - TC-MDP-1123-01818
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/28/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/04/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1123-01818
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 03/28/2024 | Post-Tension Inspection Report is required. |
| 03/28/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 04/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 04/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 04/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 08/23/2023 | Post-Tension Inspection Report is required. |
| 08/23/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 11/22/2023 | THIS DOES NOT APPLY |
Conditions
Permit Number - TC-MDP-1123-01818
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
| Date | Description | Comments |
|---|---|---|
| 08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/22/2023 | THIS DOES NOT APPLY |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01818
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/30/2024 | COT - RSPL - Rough Soil | Passed | ||
| 04/30/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 06/04/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/04/2024 | COT - RSBU - Preslab | Passed | ||
| 06/04/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 06/04/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/21/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/21/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 08/08/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 08/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8/12/24: DWV is completely filled with water. Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation. | |
| 08/27/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/16/2024 | BULD - Electrical Clearance | Passed | Passes electrical clearance ECO 9/16/2024 | |
| 09/19/2024 | COT - RSPL - Sewer | Passed | ||
| 10/16/2024 | COT - BULD - SWG Clearance | Passed | Gas equipment and valves are installed. SWG Clearance issued to Southwest Gas Company to install meter and turn on gas. | |
| 11/04/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete per plans and code requirements. Okay to issue Certificate of Occupancy. | |
| 11/04/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is complete per plans and code requirements. Okay to issue Certificate of Occupancy. | |
| 11/04/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete per plans and code requirements. Okay to issue Certificate of Occupancy. | |
| 11/04/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete per plans and code requirements. Okay to issue Certificate of Occupancy. | |
| 11/04/2024 | ENGR Engineering Final | Passed | ||
| 11/04/2024 | RSBU - Building Final | Passed | Construction is complete per plans and code requirements. Okay to issue Certificate of Occupancy. | |
| 11/04/2024 | RSBU - Building Progress | Passed | Construction is complete per plans and code requirements. Okay to issue Certificate of Occupancy. |