Permit: TC-MDP-1123-01817
Permit Details
Apply Date:
11/17/2023
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130
Permit Reviews
Permit Number - TC-MDP-1123-01817
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/15/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1123-01817
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
03/01/2024 | Post-Tension Inspection Report is required. |
03/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
03/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
03/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
03/15/2024 | Post-Installed Anchor Inspection Report is required. |
03/15/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
11/22/2023 | THIS DOES NOT APPLY |
Conditions
Permit Number - TC-MDP-1123-01817
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Date | Description | Comments |
---|---|---|
08/23/2023 | Post-Tension Inspection Report is required. | |
08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
11/22/2023 | THIS DOES NOT APPLY | |
08/23/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01817
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/12/2024 | COT - RSPL - Yard Water Line | Passed | ||
04/12/2024 | COT - RSPL - Rough Soil | Passed | ||
04/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/25/2024 | COT - RSBU - Preslab | Passed | ||
04/25/2024 | COT - RSEL - Electrical Underground | Passed | ||
04/25/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
06/06/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/06/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/15/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
07/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/02/2024 | COT - RSBU - Interior Shear Bracing | Passed | 8/2/24: Plans are onsite. Sheet rock on interior shear walls is properly secured to the studs with screws at the correct spacing per the plan. Okay to proceed with tape, texture, and paint. | |
08/06/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
09/10/2024 | COT - RSPL - Sewer | Passed | ||
09/16/2024 | COT - BULD - SWG Clearance | Passed | ||
10/18/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/18/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/18/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/18/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/18/2024 | RSBU - Building Final | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/18/2024 | RSBU - Building Progress | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/23/2024 | ENGR Engineering Final | Passed | CO Ready |