Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9103 E WHITE BLUFF CT
Apply Date:
02/15/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130

Permit Reviews

Permit Number - TC-MDP-1123-01816
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Start Date Submittal Complete Date Status  
02/15/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/26/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01816
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 5
Date Name
02/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/23/2023 Post-Tension Inspection Report is required.
08/23/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
11/22/2023 THIS DOES NOT APPLY

Conditions

Permit Number - TC-MDP-1123-01816
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Date Description Comments
08/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 THIS DOES NOT APPLY

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01816
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/12/2024 COT - RSPL - Yard Water Line Passed
04/12/2024 COT - RSPL - Rough Soil Passed
04/25/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/25/2024 COT - RSBU - Preslab Passed
04/25/2024 COT - RSEL - Electrical Underground Passed
04/25/2024 COT - RSEL - Grounding/Bonding Passed
06/05/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 6/4/24: Plywood sheathing for shear walls is properly installed and secured to studs per shear wall plan requirements. Masa clips and shear wall hold downs are properly nailed off. Bottom plates are secured to concrete floor with shot pins, anchor bolts, or titans. Okay to proceed with top out of plumbing.
06/05/2024 COT - RSBU - Roof Nailing Passed 6/4/24: Roof trusses are properly installed and secured to top plate with H2.5 clips. Roof sheathing is properly secured to trusses with nails. Okay to proceed with top out of plumbing.
07/10/2024 COT - RSPL - Gas Pressure Test Passed Gas line is holding 15 pounds of air pressure. Okay to proceed.
07/12/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7/12/24: Electrical box and data cable are properly installed in wall. Okay to proceed with installation of insulation and drywall.
08/02/2024 COT - RSBU - Interior Shear Bracing Passed 8/2/24: Plans are onsite. Sheet rock on interior shear walls is properly secured to the studs with screws at the correct spacing per the plan. Okay to proceed with tape, texture, and paint.
08/06/2024 BULD - Electrical Clearance Passed TEP ECO
09/10/2024 COT - RSPL - Sewer Passed
10/11/2024 COT - RSEL - Electrical Final Passed Construction is complete per plans. Okay to issue Certificate of Occupancy.
10/11/2024 COT - RSEL - Outdoor Lighting Passed Construction is complete per plans. Okay to issue Certificate of Occupancy.
10/11/2024 COT - RSME - Mechanical Final Passed Construction is complete per plans. Okay to issue Certificate of Occupancy.
10/11/2024 COT - RSPL - Plumbing Final Passed Construction is complete per plans. Okay to issue Certificate of Occupancy.
10/11/2024 RSBU - Building Final Passed Construction is complete per plans. Okay to issue Certificate of Occupancy.
10/11/2024 RSBU - Building Progress Passed Construction is complete per plans. Okay to issue Certificate of Occupancy.
10/15/2024 ENGR Engineering Final Passed Tree in the front yard don't look to happy but there is some green on it.
Clean out collars need to be glued down.
10/16/2024 COT - BULD - SWG Clearance Passed Gas equipment and valves are installed. SWG Clearance issued to Southwest Gas Company to install meter and turn on gas.