Permit: TC-MDP-1123-01816
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9103 E WHITE BLUFF CT
Address NEW:
9103 E WHITE BLUFF CT
Apply Date:
02/15/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130
Permit Reviews
Permit Number - TC-MDP-1123-01816
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/15/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/26/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1123-01816
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 02/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 02/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/23/2023 | Post-Tension Inspection Report is required. |
| 08/23/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 11/22/2023 | THIS DOES NOT APPLY |
Conditions
Permit Number - TC-MDP-1123-01816
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
| Date | Description | Comments |
|---|---|---|
| 08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/22/2023 | THIS DOES NOT APPLY |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01816
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/12/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 04/12/2024 | COT - RSPL - Rough Soil | Passed | ||
| 04/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/25/2024 | COT - RSBU - Preslab | Passed | ||
| 04/25/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 04/25/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/05/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 6/4/24: Plywood sheathing for shear walls is properly installed and secured to studs per shear wall plan requirements. Masa clips and shear wall hold downs are properly nailed off. Bottom plates are secured to concrete floor with shot pins, anchor bolts, or titans. Okay to proceed with top out of plumbing. | |
| 06/05/2024 | COT - RSBU - Roof Nailing | Passed | 6/4/24: Roof trusses are properly installed and secured to top plate with H2.5 clips. Roof sheathing is properly secured to trusses with nails. Okay to proceed with top out of plumbing. | |
| 07/10/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is holding 15 pounds of air pressure. Okay to proceed. | |
| 07/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 7/12/24: Electrical box and data cable are properly installed in wall. Okay to proceed with installation of insulation and drywall. | |
| 08/02/2024 | COT - RSBU - Interior Shear Bracing | Passed | 8/2/24: Plans are onsite. Sheet rock on interior shear walls is properly secured to the studs with screws at the correct spacing per the plan. Okay to proceed with tape, texture, and paint. | |
| 08/06/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 09/10/2024 | COT - RSPL - Sewer | Passed | ||
| 10/11/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/11/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/11/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/11/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/11/2024 | RSBU - Building Final | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/11/2024 | RSBU - Building Progress | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/15/2024 | ENGR Engineering Final | Passed | Tree in the front yard don't look to happy but there is some green on it. Clean out collars need to be glued down. |
|
| 10/16/2024 | COT - BULD - SWG Clearance | Passed | Gas equipment and valves are installed. SWG Clearance issued to Southwest Gas Company to install meter and turn on gas. |