Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4743 E 1ST ST BLDG 1
Apply Date:
11/13/2023
Applicant:
Fernan Salazar
Description:
SDGM1184 Duplex

Permit Reviews

Permit Number - TC-MDP-1123-01809
Permit Status: Complete
Permit Description: SDGM1184 Duplex
Start Date Submittal Complete Date Status  
04/01/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/04/2024 APPROVED Review Details
11/14/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 11/14/2023 REQUIRES RESUBMIT Review Details
09/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/02/2024 APPROVED Review Details
08/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/30/2024 APPROVED Review Details
02/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/08/2024 APPROVED Review Details
12/20/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.3 01/08/2024 REQUIRES RESUBMIT Review Details
01/24/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.4 01/24/2024 APPROVED Review Details
12/12/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.2 12/18/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-1123-01809
Permit Status: Complete
Permit Description: SDGM1184 Duplex
Date Description Comments
08/29/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/14/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1123-01809
Permite Description: SDGM1184 Duplex
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
05/08/2024 BULD - Electrical Clearance N/A Not Ready 5/8/24: not ready
05/08/2024 COT - RSEL - Grounding/Bonding N/A Not Ready 5/8/24: not ready not ufer, doing to ground rounds
08/28/2024 COT - RSEL - Electrical Underground N/A Not Applicable
08/28/2024 COT - BULD - SWG Clearance N/A Not Applicable
08/28/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1123-01809
Permit Description: SDGM1184 Duplex
Total Completed Inspections - 18
Date Description Inspector Results Comments
03/01/2024 COT - RSPL - Sewer Passed Underground plumbing is complete and connected to the main sewer line. System is under a 10' hydro test with no leaks. Okay to shade pipes, backfill trenches, and proceed with subsoil compaction for slab on grade.
03/01/2024 COT - RSPL - Rough Soil Passed Underground plumbing is complete and connected to the main sewer line. System is under a 10' hydro test with no leaks. Okay to shade pipes, backfill trenches, and proceed with subsoil compaction for slab on grade.
03/12/2024 COT - RSBU - Preslab Passed
03/12/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/01/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/01/2024 COT - RSBU - Roof Nailing Passed
05/08/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/08/2024 RSBU - Building Progress Passed
05/08/2024 COT - RSPL - Yard Water Line Passed
05/10/2024 BULD - Electrical Clearance Passed TEP eco for 4743 e 1st st building 1 units 1101 and 1102
05/10/2024 COT - RSEL - Grounding/Bonding Passed
08/28/2024 COT - RSBU - Interior Shear Bracing Passed Submit letter from licensed contractor on company letterhead taking responsibility for the scope of this inspection. Received contractors letter. EWS
08/28/2024 COT - RSME - Mechanical Final Passed
08/28/2024 ENGR Engineering Final Passed
08/28/2024 COT - RSEL - Outdoor Lighting Passed
08/28/2024 COT - RSPL - Plumbing Final Passed
08/28/2024 COT - RSEL - Electrical Final Passed
09/23/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
INSPECTION LETTER - 4743 E. 1ST ST 1101 - 1102_V1.PDF DOCUMENTS VIEW
ONE BEDROOM DUPLEX LAYOUT_V1.PDF DOCUMENTS VIEW
TRUSS SEAL_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
B- SITE PLAN (4743 E. 1ST) BUILDING 1- (12.19.23)_V1.PDF DOCUMENTS VIEW