Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
2332 W OWL PERCH LP
Apply Date:
04/29/2024
Applicant:
David Martin
Description:
SFR K35W T21-M0037

Permit Reviews

Permit Number - TC-MDP-1123-01806
Permit Status: Inspections complete
Permit Description: SFR K35W T21-M0037
Start Date Submittal Complete Date Status  
08/01/2024 SITE FROM MODEL PERMIT - SUBDIVISION REVISION v.1 08/07/2024 APPROVED Review Details
04/29/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 05/06/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01806
Permit Status: Inspections complete
Permit Description: SFR K35W T21-M0037
Total Outstanding Activity Conditions - 3
Date Name
05/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/01/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-1123-01806
Permit Status: Inspections complete
Permit Description: SFR K35W T21-M0037
Date Description Comments
11/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/01/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01806
Permit Description: SFR K35W T21-M0037
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/20/2024 COT - RSPL - Backwater Valve Passed 5/20/24: plumbing per plans ok to proceed. Shading required
05/20/2024 COT - RSPL - Rough Soil Passed 5/20/24: plumbing per plans ok to proceed. Shading required
05/20/2024 COT - RSPL - Sewer Passed 5/20/24: plumbing per plans ok to proceed. Shading required
05/20/2024 COT - RSPL - Yard Water Line Passed 5/20/24: passed ok to backfill
05/29/2024 COT - RSBU - Preslab Passed
05/29/2024 COT - RSEL - Electrical Underground Passed
05/29/2024 COT - RSEL - Grounding/Bonding Passed
05/29/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/12/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
07/12/2024 COT - RSBU - Roof Nailing Passed
08/07/2024 COT - RSPL - Gas Pressure Test Passed
08/08/2024 BULD - Electrical Clearance Passed Clamp on you for to ground is loose. Please use socket and ratchet to make this connection to ensure it's tight.
8/8/24: ECO TEP Clearance
08/09/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/23/2024 COT - RSBU - Interior Shear Bracing Passed
10/01/2024 COT - BULD - SWG Clearance Passed
10/15/2024 COT - RSEL - Electrical Final Passed 10-15-24, electrical final approved.
10/15/2024 COT - RSEL - Outdoor Lighting Passed 10-15-25, outdoor lighting approved.
10/15/2024 COT - RSME - Mechanical Final Passed 10-15-24, mechanical final approved.
10/15/2024 COT - RSPL - Plumbing Final Passed 10-15-24,plumbing final approved.
10/15/2024 RSBU - Building Final Passed 10-15-24,building final approved.
10/15/2024 RSBU - Building Progress Passed
10/18/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
1_REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-04-29_V1.PDF DOCUMENTS VIEW