Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
2396 W OWL PERCH LP
Apply Date:
11/28/2023
Applicant:
Description:
SFR K35W T21-M0037

Permit Reviews

Permit Number - TC-MDP-1123-01804
Permit Status: Inspections complete
Permit Description: SFR K35W T21-M0037
Start Date Submittal Complete Date Status  
11/29/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 12/04/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01804
Permit Status: Inspections complete
Permit Description: SFR K35W T21-M0037
Total Outstanding Activity Conditions - 4
Date Name
11/29/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/29/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/29/2023 Post-Tension Inspection Report is required.
11/29/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-1123-01804
Permit Status: Inspections complete
Permit Description: SFR K35W T21-M0037
Date Description Comments
11/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01804
Permit Description: SFR K35W T21-M0037
Total Completed Inspections - 22
Date Description Inspector Results Comments
01/11/2024 COT - RSPL - Backwater Valve Passed Okay to backfill. Shading required. 1/11/2024
01/11/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 1/11/2024
01/11/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 1/11/2024
01/11/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 1/11/2024
01/19/2024 COT - RSEL - Electrical Underground Passed
01/19/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
01/19/2024 COT - RSBU - Preslab Passed
01/19/2024 COT - RSEL - Grounding/Bonding Passed
02/14/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
02/14/2024 COT - RSBU - Roof Nailing Passed
03/05/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 3/5/2024
03/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/05/2024 COT - RSPL - Gas Pressure Test Passed
03/18/2024 COT - RSBU - Interior Shear Bracing Passed
04/25/2024 COT - BULD - SWG Clearance Passed SWG for meter only
05/14/2024 COT - RSEL - Electrical Final Passed
05/14/2024 COT - RSEL - Outdoor Lighting Passed
05/14/2024 COT - RSME - Mechanical Final Passed
05/14/2024 COT - RSPL - Plumbing Final Passed
05/14/2024 ENGR Engineering Final Passed Note, missing gate and clean outs in front yard create a trip hazard being so high above grade.
05/14/2024 RSBU - Building Final Passed
05/14/2024 RSBU - Building Progress Passed