Permit: TC-MDP-1123-01804
Permit Details
Apply Date:
11/28/2023
Applicant:
Description:
SFR K35W T21-M0037
Permit Reviews
Permit Number - TC-MDP-1123-01804
Permit Status: Inspections complete
Permit Description: SFR K35W T21-M0037
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/29/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/04/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1123-01804
Permit Status: Inspections complete
Permit Description: SFR K35W T21-M0037
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
11/29/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
11/29/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
11/29/2023 | Post-Tension Inspection Report is required. |
11/29/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-1123-01804
Permit Status: Inspections complete
Permit Description: SFR K35W T21-M0037
Date | Description | Comments |
---|---|---|
11/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01804
Permit Description: SFR K35W T21-M0037
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/11/2024 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading required. 1/11/2024 | |
01/11/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 1/11/2024 | |
01/11/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 1/11/2024 | |
01/11/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 1/11/2024 | |
01/19/2024 | COT - RSEL - Electrical Underground | Passed | ||
01/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
01/19/2024 | COT - RSBU - Preslab | Passed | ||
01/19/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
02/14/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
02/14/2024 | COT - RSBU - Roof Nailing | Passed | ||
03/05/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 3/5/2024 | |
03/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
03/05/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
03/18/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
04/25/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
05/14/2024 | COT - RSEL - Electrical Final | Passed | ||
05/14/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
05/14/2024 | COT - RSME - Mechanical Final | Passed | ||
05/14/2024 | COT - RSPL - Plumbing Final | Passed | ||
05/14/2024 | ENGR Engineering Final | Passed | Note, missing gate and clean outs in front yard create a trip hazard being so high above grade. | |
05/14/2024 | RSBU - Building Final | Passed | ||
05/14/2024 | RSBU - Building Progress | Passed |