Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/05/2024
Applicant:
Daria Hopkins
Description:
SFR 130.1600 T21-M0030

Permit Reviews

Permit Number - TC-MDP-1123-01796
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
Start Date Submittal Complete Date Status  
01/05/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/11/2024 APPROVED Review Details
10/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/11/2024 APPROVED Review Details
07/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/15/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1123-01796
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
Date Description Comments
01/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/09/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/09/2024 Post-Tension Inspection Report is required.
11/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
01/09/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1123-01796
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/15/2024 COT - RSPL - Rough Soil Passed
05/15/2024 COT - RSPL - Sewer Passed
05/16/2024 COT - RSPL - Yard Water Line Passed
05/29/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/29/2024 COT - RSBU - Preslab Passed
05/29/2024 COT - RSEL - Grounding/Bonding Passed
05/29/2024 COT - RSEL - Electrical Underground Passed
06/12/2024 COT - RSBU - Roof Nailing Passed
06/12/2024 COT - RSBU - Exterior Clips/Sheathing Passed
07/03/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 7/3/2024
07/15/2024 COT - RSPL - Gas Pressure Test Passed
07/19/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/02/2024 COT - RSBU - Interior Shear Bracing Passed
09/10/2024 COT - BULD - SWG Clearance Passed Passed SW gas clearance 9/10/24
09/18/2024 COT - RSEL - Electrical Final Passed
09/18/2024 COT - RSEL - Outdoor Lighting Passed
09/18/2024 COT - RSME - Mechanical Final Passed
09/18/2024 COT - RSPL - Plumbing Final Passed
09/18/2024 RSBU - Building Final Passed
09/18/2024 RSBU - Building Progress Passed
09/20/2024 ENGR Engineering Final Passed CO ready

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 29 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 29 SPECIAL INSPECTION CERTIFICATE-2024-01-05_V1.PDF DOCUMENTS VIEW
147897 PT LOT 29 COMPLETE-2024-07-10_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW