Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1123-01784
Permit Details
Apply Date:
12/29/2023
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065
Permit Reviews
Permit Number - TC-MDP-1123-01784
Permit Status: Issued
Permit Description: SFR MERI213021 T21-M0065
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/21/2024 | APPROVED |
12/29/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/04/2024 | APPROVED |
09/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/27/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1123-01784
Permit Status: Issued
Permit Description: SFR MERI213021 T21-M0065
Date | Description | Comments |
---|---|---|
12/29/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
12/29/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
12/29/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/02/2024 | Post-Tension Inspection Report is required. | |
11/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/29/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
12/29/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/02/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-1123-01784
Permite Description: SFR MERI213021 T21-M0065
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 6/21/24: properly secure thermostat wire in wall at second floor, seal all penetrations through vapor barrier and top plate, properly support Flex duct at first floor, properly support range exhaust. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-1123-01784
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 22