Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
12/29/2023
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065

Permit Reviews

Permit Number - TC-MDP-1123-01784
Permit Status: Issued
Permit Description: SFR MERI213021 T21-M0065
Start Date Submittal Complete Date Status  
06/21/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/21/2024 APPROVED Review Details
12/29/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/04/2024 APPROVED Review Details
09/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/27/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1123-01784
Permit Status: Issued
Permit Description: SFR MERI213021 T21-M0065
Date Description Comments
12/29/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/29/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/29/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/02/2024 Post-Tension Inspection Report is required.
11/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/29/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/29/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/02/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-1123-01784
Permite Description: SFR MERI213021 T21-M0065
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/21/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 6/21/24: properly secure thermostat wire in wall at second floor, seal all penetrations through vapor barrier and top plate, properly support Flex duct at first floor, properly support range exhaust.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-1123-01784
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/22/2024 COT - RSPL - Backwater Valve Passed
04/22/2024 COT - RSPL - Rough Soil Passed
04/22/2024 COT - RSPL - Sewer Passed
04/30/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/30/2024 COT - RSBU - Preslab Passed
04/30/2024 COT - RSEL - Electrical Underground Passed
04/30/2024 COT - RSEL - Grounding/Bonding Passed
05/30/2024 COT - RSBU - Exterior Clips/Sheathing Passed
05/30/2024 COT - RSBU - Roof Nailing Passed
06/21/2024 COT - RSPL - Gas Pressure Test Passed
06/21/2024 COT - RSPL - Yard Water Line Passed
06/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 6/26/2024
07/11/2024 COT - RSBU - Interior Shear Bracing Passed
07/30/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 7/30/2024
08/28/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/28/2024
09/13/2024 COT - RSEL - Electrical Final Passed
09/13/2024 COT - RSEL - Outdoor Lighting Passed
09/13/2024 COT - RSME - Mechanical Final Passed
09/13/2024 COT - RSPL - Plumbing Final Passed
09/13/2024 ENGR Engineering Final Passed Move in ready
09/13/2024 RSBU - Building Final Passed
09/13/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
147306 PT LOT 157 COMPLETE-2024-06-18_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 157 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 157 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 157 SPECIAL INSPECTION CERTIFICATE-2023-12-29_V1.PDF DOCUMENTS VIEW