Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
11/07/2023
Applicant:
Celina Rodriguez
Description:
SFR BT2013-140 T22-M0036

Permit Reviews

Permit Number - TC-MDP-1123-01782
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Start Date Submittal Complete Date Status  
11/08/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/15/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01782
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Total Outstanding Activity Conditions - 4
Date Name
11/08/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/08/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/14/2023 Post-Tension Inspection Report is required.
11/14/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-1123-01782
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Date Description Comments
11/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/08/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01782
Permite Description: SFR BT2013-140 T22-M0036
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/12/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 2/12/24: notched double top plate needs ties installed. Missing anchor bolts at shear walls. DWV not under test. Missing nail plate a laundry room.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01782
Permit Description: SFR BT2013-140 T22-M0036
Total Completed Inspections - 21
Date Description Inspector Results Comments
11/29/2023 COT - RSPL - Yard Water Line Passed Water line is under 80 psi compressed air from meter box to connection point at house.
11/29/2023 COT - RSPL - Sewer Passed Underground plumbing is connected to main sewer line. Okay to shade pipe and backfill trenches.
11/29/2023 COT - RSPL - Rough Soil Passed Underground plumbing is complete and under a 10' water test. Okay to shade pipe and backfill trenches.
12/06/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
12/06/2023 COT - RSBU - Preslab Passed
12/06/2023 COT - RSEL - Electrical Underground Passed
12/06/2023 COT - RSEL - Grounding/Bonding Passed
12/21/2023 COT - RSBU - Exterior Clips/Sheathing Passed 12/21/23: missing anchor bolts at shear walls okay to proceed to intermediates will check for them then
12/21/2023 COT - RSBU - Roof Nailing Passed
02/12/2024 COT - RSPL - Gas Pressure Test Passed
02/13/2024 BULD - Electrical Clearance Passed TEP eco
02/20/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/29/2024 COT - RSBU - Interior Shear Bracing Passed
04/23/2024 COT - BULD - SWG Clearance Passed Clearance for SOUTHWEST GAS. 4/23/2024
05/06/2024 COT - RSEL - Electrical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. AFCI & GFCI breakers are installed in electrical panel for bedrooms, kitchen, bathrooms, exterior outlets, laundry room, and garage. Okay to issue Certificate of Occupancy once all other agencies approve permit.
05/06/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is installed and operational per plans and code requirements.
05/06/2024 COT - RSME - Mechanical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. AFCI & GFCI breakers are installed in electrical panel for bedrooms, kitchen, bathrooms, exterior outlets, laundry room, and garage. Okay to issue Certificate of Occupancy once all other agencies approve permit.
05/06/2024 COT - RSPL - Plumbing Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. AFCI & GFCI breakers are installed in electrical panel for bedrooms, kitchen, bathrooms, exterior outlets, laundry room, and garage. Okay to issue Certificate of Occupancy once all other agencies approve permit.
05/06/2024 RSBU - Building Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. AFCI & GFCI breakers are installed in electrical panel for bedrooms, kitchen, bathrooms, exterior outlets, laundry room, and garage. Okay to issue Certificate of Occupancy once all other agencies approve permit.
05/06/2024 ENGR Engineering Final Passed
05/06/2024 RSBU - Building Progress Passed Complete

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA II 13 SIC-2023-11-07_V1.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2 - LOT 13 START_V1.PDF DOCUMENTS VIEW
P21WP00207 FINAL ACCEPTANCE BTII_V1.PDF DOCUMENTS VIEW