Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1123-01780
Permit Details
Apply Date:
01/11/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2013-140 T22-M0036
Permit Reviews
Permit Number - TC-MDP-1123-01780
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1123-01780
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
01/12/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
01/12/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
01/12/2024 | Post-Installed Anchor Inspection Report is required. |
01/12/2024 | Post-Tension Inspection Report is required. |
01/12/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
01/12/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-1123-01780
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Date | Description | Comments |
---|---|---|
11/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01780
Permite Description: SFR BT2013-140 T22-M0036
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/16/2024 | ENGR Engineering Final | N/A | Not Ready | verify rear yard drainage. does not appear to perform per plan. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01780
Permit Description: SFR BT2013-140 T22-M0036
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/27/2024 | COT - RSPL - Backwater Valve | Passed | ||
02/27/2024 | COT - RSPL - Rough Soil | Passed | ||
02/27/2024 | COT - RSPL - Yard Water Line | Passed | ||
02/27/2024 | COT - RSPL - Sewer | Passed | ||
03/04/2024 | COT - RSBU - Preslab | Passed | ||
03/04/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
03/04/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
03/04/2024 | COT - RSEL - Electrical Underground | Passed | ||
04/01/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | All bolts are properly installed, all clips for bottom plates are nailed to plate, all shear wall sheathing is properly nailed and secured to studs, and all rafters have h2.5 clips properly nailed to top plate. Okay to proceed with dry-in and stucco foam and lath application. | |
04/01/2024 | COT - RSBU - Roof Nailing | Passed | Roof sheathing is properly nailed off, every rafter has a h2.5 clip holding it down to the top plate and is properly nailed. Okay to proceed with dry-in of roof. | |
04/29/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 10# of air pressure and holding. Okay to proceed. | |
05/03/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
05/03/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
05/21/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/03/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed in garage and attic for gas appliances. Okay to install meter and turn on gas | |
08/16/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy. | |
08/16/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy. | |
08/16/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy. | |
08/16/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy. | |
08/16/2024 | RSBU - Building Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy. | |
08/16/2024 | RSBU - Building Progress | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy. | |
08/23/2024 | ENGR Engineering Final | Passed |