Permit Reviews

Permit Number - TC-MDP-1123-01778
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Start Date Submittal Complete Date Status  
12/28/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/03/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01778
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Total Outstanding Activity Conditions - 4
Date Name
01/02/2024 Post-Tension Inspection Report is required.
01/02/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
12/28/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/28/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - TC-MDP-1123-01778
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Date Description Comments
11/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/28/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01778
Permit Description: SFR BT2013-140 T22-M0036
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/29/2024 COT - RSPL - Yard Water Line Passed
01/29/2024 COT - RSPL - Rough Soil Passed
01/29/2024 COT - RSPL - Sewer Passed
02/06/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/06/2024 COT - RSBU - Preslab Passed
02/06/2024 COT - RSEL - Grounding/Bonding Passed
02/06/2024 COT - RSEL - Electrical Underground Passed
02/22/2024 COT - RSBU - Exterior Clips/Sheathing Passed
02/22/2024 COT - RSBU - Roof Nailing Passed
03/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/26/2024 COT - RSPL - Gas Pressure Test Passed
04/11/2024 BULD - Electrical Clearance Passed TEP ECO
04/15/2024 COT - RSBU - Interior Shear Bracing Passed
06/21/2024 COT - BULD - SWG Clearance Passed
07/05/2024 ENGR Engineering Final Passed Clean up the paint residue in the rear of the yard prior to allowing the homeowners to move into the site. I tried contacting Jake Wallace and Celina Rodriguez, and advise them of the above comments, so that this can be completed prior to the homeowner moving into the house.
07/05/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is properly installed per plans.
07/09/2024 COT - RSEL - Electrical Final Passed 7/9/24: canceled per contractor
07/09/2024 COT - RSME - Mechanical Final Passed 7/9/24: canceled per contractor
07/09/2024 COT - RSPL - Plumbing Final Passed
07/09/2024 RSBU - Building Final Passed
07/09/2024 RSBU - Building Progress Passed 7/9/24: canceled per contractor

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA 11 SIC-2023-12-28_V1.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2 - LOT 11 START_V1.PDF DOCUMENTS VIEW