Permit: TC-MDP-1123-01773
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
6143 E CAMPOLINA TR
Address NEW:
6143 E CAMPOLINA TR
Apply Date:
11/07/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30K Model Plan
Permit Reviews
Permit Number - TC-MDP-1123-01773
Permit Status: Inspections
Permit Description: Blackhawk H30K Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/07/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/14/2023 | REQUIRES RESUBMIT |
| 03/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 03/18/2024 | APPROVED |
| 09/02/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/02/2025 | APPROVED |
| 04/16/2026 | SPECIAL INSPECTION REVIEW v.1 | 04/16/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-1123-01773
Permit Status: Inspections
Permit Description: Blackhawk H30K Model Plan
| Date | Description | Comments |
|---|---|---|
| 11/07/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/07/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/14/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/03/2023 | Post-Tension Inspection Report is required. | |
| 11/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/07/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 09/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1123-01773
Permit Description: Blackhawk H30K Model Plan
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2026 | COT - RSPL - Sewer | Passed | 2/13/26: PLUMBING UNDERGROUND/ SEWER CONNECTION/ MAIN WATER LINE HAVE ALL BE INSTALLED PER APPROVED PLANS. OK TO PROCEED WITH BACKFILL. SHADING REQUIRED | |
| 02/13/2026 | COT - RSPL - Yard Water Line | Passed | 2/13/26: PLUMBING UNDERGROUND/ SEWER CONNECTION/ MAIN WATER LINE HAVE ALL BE INSTALLED PER APPROVED PLANS. OK TO PROCEED WITH BACKFILL. SHADING REQUIRED | |
| 02/13/2026 | COT - RSPL - Rough Soil | Passed | 2/13/26: PLUMBING UNDERGROUND/ SEWER CONNECTION/ MAIN WATER LINE HAVE ALL BE INSTALLED PER APPROVED PLANS. OK TO PROCEED WITH BACKFILL. SHADING REQUIRED | |
| 02/25/2026 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 2/25/2026 | |
| 02/25/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 02/26/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 2/26/26 | |
| 02/26/2026 | COT - RSBU - Preslab | Passed | Passed 2/26/26 | |
| 02/26/2026 | COT - RSEL - Grounding/Bonding | Passed | Passed 2/26/26 | |
| 04/02/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4.2.26 Corrections made approved |
|
| 04/02/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 04/17/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 04/17/2026 Verified added bracing to DWV midway in upstairs bathroom, added blocking to line set on north wall, sealed penetration to vapor barrier, and added Boca plates to sill plates protection for water lines. |
|
| 04/17/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 04/29/2026 | COT - RSBU - Interior Shear Bracing | Passed |