Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
6143 E CAMPOLINA TR
Apply Date:
11/07/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30K Model Plan

Permit Reviews

Permit Number - TC-MDP-1123-01773
Permit Status: Inspections
Permit Description: Blackhawk H30K Model Plan
Start Date Submittal Complete Date Status  
11/07/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/14/2023 REQUIRES RESUBMIT Review Details
03/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 03/18/2024 APPROVED Review Details
09/02/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/02/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01773
Permit Status: Inspections
Permit Description: Blackhawk H30K Model Plan
Total Outstanding Activity Conditions - 6
Date Name
09/07/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
10/03/2023 Post-Tension Inspection Report is required.
11/07/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/07/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/07/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
11/14/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - TC-MDP-1123-01773
Permit Status: Inspections
Permit Description: Blackhawk H30K Model Plan
Date Description Comments
11/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1123-01773
Permit Description: Blackhawk H30K Model Plan
Total Completed Inspections - 8
Date Description Inspector Results Comments
02/13/2026 COT - RSPL - Sewer Passed 2/13/26: PLUMBING UNDERGROUND/ SEWER CONNECTION/ MAIN WATER LINE HAVE ALL BE INSTALLED PER APPROVED PLANS. OK TO PROCEED WITH BACKFILL. SHADING REQUIRED
02/13/2026 COT - RSPL - Yard Water Line Passed 2/13/26: PLUMBING UNDERGROUND/ SEWER CONNECTION/ MAIN WATER LINE HAVE ALL BE INSTALLED PER APPROVED PLANS. OK TO PROCEED WITH BACKFILL. SHADING REQUIRED
02/13/2026 COT - RSPL - Rough Soil Passed 2/13/26: PLUMBING UNDERGROUND/ SEWER CONNECTION/ MAIN WATER LINE HAVE ALL BE INSTALLED PER APPROVED PLANS. OK TO PROCEED WITH BACKFILL. SHADING REQUIRED
02/25/2026 BULD - Electrical Clearance Passed Clearance for TEP ECO. 2/25/2026
02/25/2026 COT - RSEL - Electrical Underground Passed
02/26/2026 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 2/26/26
02/26/2026 COT - RSBU - Preslab Passed Passed 2/26/26
02/26/2026 COT - RSEL - Grounding/Bonding Passed Passed 2/26/26

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 27 SIC REVISION_V1.PDF DOCUMENTS VIEW
BHK 27 REVISED D1_V1.PDF DOCUMENTS VIEW