Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1123-01773
Permit Details
Apply Date:
11/07/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30K Model Plan
Permit Reviews
Permit Number - TC-MDP-1123-01773
Permit Status: Issued
Permit Description: Blackhawk H30K Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/07/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/14/2023 | REQUIRES RESUBMIT |
03/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 03/18/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1123-01773
Permit Status: Issued
Permit Description: Blackhawk H30K Model Plan
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
09/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
10/03/2023 | Post-Tension Inspection Report is required. |
11/07/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
11/07/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
11/07/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
11/14/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-1123-01773
Permit Status: Issued
Permit Description: Blackhawk H30K Model Plan
Date | Description | Comments |
---|---|---|
11/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |