Permit: TC-MDP-1123-01769
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6152 E CAMPOLINA TR
Address NEW:
6152 E CAMPOLINA TR
Apply Date:
11/07/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30M Model Plan
Permit Reviews
Permit Number - TC-MDP-1123-01769
Permit Status: Inspections complete
Permit Description: Blackhawk H30M Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/01/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 03/18/2024 | APPROVED |
| 01/22/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/23/2026 | APPROVED |
| 11/07/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 11/14/2023 | REQUIRES RESUBMIT |
| 09/02/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/02/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1123-01769
Permit Status: Inspections complete
Permit Description: Blackhawk H30M Model Plan
| Date | Description | Comments |
|---|---|---|
| 11/07/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/07/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/14/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/03/2023 | Post-Tension Inspection Report is required. | |
| 11/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/07/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 09/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01769
Permite Description: Blackhawk H30M Model Plan
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/31/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Partial Pass | 12/31/2025 Engineer letter/fix on broken web of H12 truss and J01 jack truss upstairs. Missing shear wall on NE corner upstairs, add sister stud to damaged stud in 1st floor bathroom east wall as marked. |
| 12/31/2025 | COT - RSBU - Roof Nailing | N/A | Partial Pass | 12/31/2025 Engineer letter/fix on broken web of H12 truss and J01 jack truss upstairs. Missing shear wall on NE corner upstairs, add sister stud to damaged stud in 1st floor bathroom east wall as marked. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01769
Permit Description: Blackhawk H30M Model Plan
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/11/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 12/12/2025 | COT - RSPL - Rough Soil | Passed | 12.12.25 Approved |
|
| 12/12/2025 | COT - RSPL - Sewer | Passed | 12.12.25 Approved |
|
| 12/18/2025 | BULD - Electrical Clearance | Passed | 12/18/2025 Clearance for TEP ECO. |
|
| 12/18/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12/18/2025 Approved per site plan. |
|
| 12/18/2025 | COT - RSBU - Preslab | Passed | 12/18/2025 Approved per plan. Okay for concrete placement. |
|
| 12/18/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 12/18/2025 | COT - RSEL - Grounding/Bonding | Passed | 12/18/2025 Bonded at ground rods to MSP. |
|
| 01/06/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 01/06/2026 Verified added shear wall to second floor NE corner and sister-ed broken stud on east wall first floor. |
|
| 01/13/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 01/13/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 01/14/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 01/14/2026 Corrections made to prior inspection, walked upstairs. Verified landed 220V lines and sealed penetrations to top plates. |
|
| 01/21/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 02/17/2026 | COT - BULD - SWG Clearance | Passed | 2.17.26 Approved |
|
| 02/23/2026 | COT - RSEL - Electrical Final | Passed | Passed 2/23/26 | |
| 02/23/2026 | COT - RSEL - Outdoor Lighting | Passed | Passed 2/23/26 | |
| 02/23/2026 | COT - RSME - Mechanical Final | Passed | Passed 2/23/26 | |
| 02/23/2026 | COT - RSPL - Plumbing Final | Passed | Passed 2/23/26 | |
| 02/23/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 02/23/2026 | RSBU - Building Final | Passed | Passed 2/23/26 | |
| 02/23/2026 | RSBU - Building Progress | Passed | Passed 2/23/26 |