Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
6131 E CAMPOLINA TR
Apply Date:
11/07/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30A Model Plan

Permit Reviews

Permit Number - TC-MDP-1123-01767
Permit Status: Inspections
Permit Description: Blackhawk H30A Model Plan
Start Date Submittal Complete Date Status  
11/07/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/14/2023 REQUIRES RESUBMIT Review Details
02/29/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 03/18/2024 APPROVED Review Details
09/02/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/02/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01767
Permit Status: Inspections
Permit Description: Blackhawk H30A Model Plan
Total Outstanding Activity Conditions - 5
Date Name
09/05/2023 Post-Tension Inspection Report is required.
09/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
11/07/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/07/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/14/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - TC-MDP-1123-01767
Permit Status: Inspections
Permit Description: Blackhawk H30A Model Plan
Date Description Comments
03/18/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/07/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1123-01767
Permit Description: Blackhawk H30A Model Plan
Total Completed Inspections - 8
Date Description Inspector Results Comments
12/01/2025 COT - RSPL - Rough Soil Passed 12-01-25: underground plumbing, backwater valve, sewer connection verified per plans and under test. Okay to backfill using shading materials.
12/01/2025 COT - RSPL - Sewer Passed 12-01-25: underground plumbing, backwater valve, sewer connection verified per plans and under test. Okay to backfill using shading materials.
12/01/2025 COT - RSPL - Yard Water Line Passed 12-1-25: main water line approved. Okay to backfill with shading materials.
12/04/2025 BULD - Electrical Clearance Passed 12.4.25
Approved
12/04/2025 COT - RSEL - Grounding/Bonding Passed 12.4.25
Approved
12/04/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 12.4.25
Approved
12/04/2025 COT - RSBU - Preslab Passed 12.4.25
Approved
12/04/2025 COT - RSEL - Electrical Underground Passed 12.4.25
Approved

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 30 REVISED SIC-2024-02-23_V2.PDF DOCUMENTS VIEW
BHK 30 REVISED D1_V2.PDF DOCUMENTS VIEW