Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
11/30/2023
Applicant:
Cassidy Fenton
Description:
SFR CASITA2X2 T20-M0045

Permit Reviews

Permit Number - TC-MDP-1123-01763
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Start Date Submittal Complete Date Status  
10/30/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 10/31/2024 APPROVED Review Details
12/01/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/06/2023 APPROVED Review Details
08/01/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/02/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-1123-01763
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Date Description Comments
12/01/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/01/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/01/2023 Masonry Inspection Report submittal review is required.
03/30/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/02/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/01/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1123-01763
Permite Description: SFR CASITA2X2 T20-M0045
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/26/2024 COT - RSPL - Plumbing Final N/A Partial Pass Partial pass. Pending dishwasher installation. 11/26/2024
11/26/2024 RSBU - Building Final N/A Partial Pass Partial pass. Pending cooking appliances and dishwasher installation. 11/26/2024

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1123-01763
Permit Description: SFR CASITA2X2 T20-M0045
Total Completed Inspections - 19
Date Description Inspector Results Comments
04/26/2024 COT - RSPL - Yard Water Line Passed
04/26/2024 COT - RSPL - Sewer Passed
04/26/2024 COT - RSPL - Rough Soil Passed
05/03/2024 COT - RSEL - Grounding/Bonding Passed
05/03/2024 COT - RSEL - Electrical Underground Passed
05/03/2024 COT - RSBU - Preslab Passed
05/03/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/24/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
07/24/2024 COT - RSBU - Roof Nailing Passed
09/10/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/10/2024 BULD - Electrical Clearance Passed
09/11/2024 RSBU - Building Progress Passed
09/17/2024 COT - RSBU - Interior Shear Bracing Passed
11/26/2024 COT - RSME - Mechanical Final Passed
11/26/2024 ENGR Engineering Final Passed
11/26/2024 COT - RSEL - Outdoor Lighting Passed
11/26/2024 COT - RSEL - Electrical Final Passed
01/23/2025 COT - RSPL - Plumbing Final Passed 1-23-25, plumbing final approved.
02/24/2025 RSBU - Building Final Passed 2/24/25 corrections made

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPROVED SEWER PLANS - BUILDING 119_V1.PDF DOCUMENTS VIEW
APPROVED WATER PLANS - BUILDING 119_V1.PDF DOCUMENTS VIEW
CASITAS ON CATALINA - SIC BUILDINGS 119-2023-11-30_V1.PDF DOCUMENTS VIEW
CASITAS ON CATALINA - SITE PLAN BUILDING 119_V1.PDF DOCUMENTS VIEW