Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
11/30/2023
Applicant:
Cassidy Fenton
Description:
SFR CASITA2X2 T20-M0045

Permit Reviews

Permit Number - TC-MDP-1123-01762
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Start Date Submittal Complete Date Status  
08/20/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/21/2024 APPROVED Review Details
12/01/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 12/06/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1123-01762
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Date Description Comments
12/01/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/01/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/01/2023 Masonry Inspection Report submittal review is required.
03/30/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/02/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/01/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1123-01762
Permite Description: SFR CASITA2X2 T20-M0045
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/22/2024 RSBU - Building Progress N/A Not Applicable
11/27/2024 COT - RSEL - Electrical Final N/A Canceled contractor needed TEP Clearance not final inspection.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1123-01762
Permit Description: SFR CASITA2X2 T20-M0045
Total Completed Inspections - 19
Date Description Inspector Results Comments
04/26/2024 COT - RSPL - Yard Water Line Passed
05/22/2024 COT - RSPL - Backwater Valve Passed Underground plumbing, sewer, and backwater valve are properly installed and under a 10' water test with no leaks present. Okay to shade pipes and backfill trenches.
05/22/2024 COT - RSPL - Rough Soil Passed Underground plumbing, sewer, and backwater valve are properly installed and under a 10' water test with no leaks present. Okay to shade pipes and backfill trenches.
05/22/2024 COT - RSPL - Sewer Passed Underground plumbing, sewer, and backwater valve are properly installed and under a 10' water test with no leaks present. Okay to shade pipes and backfill trenches.
05/31/2024 COT - RSBU - Preslab Passed
05/31/2024 COT - RSEL - Grounding/Bonding Passed
05/31/2024 COT - RSEL - Electrical Underground Passed
05/31/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/08/2024 COT - RSBU - Roof Nailing Passed
08/08/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/22/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/13/2024 COT - RSBU - Interior Shear Bracing Passed
11/27/2024 BULD - Electrical Clearance Passed ECO CLEARANCE ISSUED
02/20/2025 ENGR Engineering Final Passed
02/24/2025 COT - RSEL - Outdoor Lighting Passed 2/24/25 Passed final
02/24/2025 COT - RSME - Mechanical Final Passed 2/24/25 Passed final
02/24/2025 COT - RSPL - Plumbing Final Passed 2/24/25 Passed final
02/24/2025 RSBU - Building Final Passed 2/24/25 Passed final
02/24/2025 COT - RSEL - Electrical Final Passed 2/24/25 Passed final CLEARANCE ECO