Permit: TC-MDP-1123-01756
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY BLDG 103
Address NEW:
9125 E CATALINA HY BLDG 103
Apply Date:
11/30/2023
Applicant:
Cassidy Fenton
Description:
SFR CASITA2X2 T20-M0045
Permit Reviews
Permit Number - TC-MDP-1123-01756
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/01/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/05/2024 | APPROVED |
| 03/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/24/2025 | APPROVED |
| 11/30/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/05/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-1123-01756
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
| Date | Description | Comments |
|---|---|---|
| 11/30/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/30/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 03/30/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 11/02/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/30/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 11/30/2023 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 03/30/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1123-01756
Permite Description: SFR CASITA2X2 T20-M0045
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2024 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1123-01756
Permit Description: SFR CASITA2X2 T20-M0045
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/26/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 05/21/2024 | COT - RSPL - Sewer | Passed | ||
| 05/21/2024 | COT - RSPL - Rough Soil | Passed | ||
| 05/21/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 05/24/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
| 05/24/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
| 05/24/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
| 05/24/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
| 08/13/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/13/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/07/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 10/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 11/06/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 02/26/2025 | COT - RSEL - Electrical Final | Passed | ||
| 02/26/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 02/26/2025 | COT - RSME - Mechanical Final | Passed | ||
| 02/26/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 02/26/2025 | ENGR Engineering Final | Passed | ||
| 02/26/2025 | RSBU - Building Final | Passed |