Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
11/30/2023
Applicant:
Cassidy Fenton
Description:
SFR CASITA2X2 T20-M0045

Permit Reviews

Permit Number - TC-MDP-1123-01755
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Start Date Submittal Complete Date Status  
11/30/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 12/05/2023 APPROVED Review Details
03/13/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/24/2025 APPROVED Review Details
08/01/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/02/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1123-01755
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Date Description Comments
11/30/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/30/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/30/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/02/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/30/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/30/2023 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
03/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1123-01755
Permit Description: SFR CASITA2X2 T20-M0045
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/31/2024 COT - RSPL - Yard Water Line Passed
05/31/2024 COT - RSPL - Sewer Passed
05/31/2024 COT - RSPL - Rough Soil Passed
06/11/2024 COT - RSEL - Grounding/Bonding Passed
06/11/2024 COT - RSBU - Preslab Passed
06/11/2024 COT - RSEL - Electrical Underground Passed
06/11/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/15/2024 COT - RSBU - Roof Nailing Passed
08/15/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/07/2024 BULD - Electrical Clearance Passed TEP ECO
10/24/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/18/2024 COT - RSBU - Interior Shear Bracing Passed Drywall on interior shear walls is properly secured to studs per plan requirements. Okay to proceed with tape, texture, and paint.
03/04/2025 COT - RSEL - Electrical Final Passed
03/04/2025 COT - RSEL - Outdoor Lighting Passed
03/04/2025 COT - RSPL - Plumbing Final Passed
03/04/2025 COT - RSME - Mechanical Final Passed
03/04/2025 RSBU - Building Final Passed
03/04/2025 RSBU - Building Progress Passed
03/25/2025 ENGR Engineering Final Passed