Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
11/01/2023
Applicant:
Cassidy Fenton
Description:
SFR CASITA3X2 T20-M0046

Permit Reviews

Permit Number - TC-MDP-1123-01741
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
Start Date Submittal Complete Date Status  
11/30/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/05/2023 APPROVED Review Details
08/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/20/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1123-01741
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
Date Description Comments
11/30/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/30/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/30/2023 Masonry Inspection Report submittal review is required.
03/30/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/02/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/30/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1123-01741
Permite Description: SFR CASITA3X2 T20-M0046
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
02/04/2025 COT - RSPL - Plumbing Final N/A Re-inspection required 1-31-25, add 90 degree elbow to condensate line, missing electrical cover in bathroom.
02/04/2025 RSBU - Building Final N/A Re-inspection required 1-31-25, add 90 degree elbow to condensate line, missing electrical cover in bathroom.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1123-01741
Permit Description: SFR CASITA3X2 T20-M0046
Total Completed Inspections - 19
Date Description Inspector Results Comments
04/26/2024 COT - RSPL - Yard Water Line Passed
05/08/2024 COT - RSPL - Sewer Passed
05/08/2024 COT - RSPL - Rough Soil Passed
05/14/2024 COT - RSBU - Preslab Passed
05/14/2024 COT - RSEL - Electrical Underground Passed
05/14/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/26/2024 COT - RSBU - Roof Nailing Passed
07/26/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
09/25/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. okay to proceed with installation of insulation and drywall.
09/25/2024 COT - RSEL - Grounding/Bonding Passed
09/25/2024 RSBU - Building Progress Passed Mechanical, electrical, and plumbing rough-in is complete. okay to proceed with installation of insulation and drywall.
09/25/2024 BULD - Electrical Clearance Passed ECO Clearance issued
10/07/2024 COT - RSBU - Interior Shear Bracing Passed
01/31/2025 COT - RSEL - Outdoor Lighting Passed 1-31-25, approved.
01/31/2025 COT - RSME - Mechanical Final Passed 1-31-25, mechanical final approved.
02/04/2025 ENGR Engineering Final Passed
02/20/2025 COT - RSPL - Plumbing Final Passed 2-20-25, plumbing final approved
02/21/2025 COT - RSEL - Electrical Final Passed
02/24/2025 RSBU - Building Final Passed 2/24/25 corrections made

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
147584 PT BLDG 110 COMPLETE-2024-08-15_V1.PDF DOCUMENTS VIEW
3X2 TRUSS LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPROVED SEWER PLANS - BUILDING 110_V1.PDF DOCUMENTS VIEW
APPROVED WATER PLANS - BUILDING 110_V1.PDF DOCUMENTS VIEW
CASITAS ON CATALINA - SIC BUILDING 110-2023-11-30_V1.PDF DOCUMENTS VIEW
CASITAS ON CATALINA - SITE PLAN BUILDING 110_V1.PDF DOCUMENTS VIEW