Status:
Complete
Type:
Model Building Permit
Apply Date:
11/05/2023
Applicant:
Cassidy Fenton
Description:
SFR CASITA3X2 T20-M0046

Permit Reviews

Permit Number - TC-MDP-1123-01740
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
Start Date Submittal Complete Date Status  
03/13/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/14/2025 APPROVED Review Details
07/31/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/01/2024 APPROVED Review Details
11/06/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/16/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1123-01740
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
Date Description Comments
11/06/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/06/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/06/2023 Masonry Inspection Report submittal review is required.
03/30/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/02/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/06/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1123-01740
Permite Description: SFR CASITA3X2 T20-M0046
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/17/2024 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1123-01740
Permit Description: SFR CASITA3X2 T20-M0046
Total Completed Inspections - 18
Date Description Inspector Results Comments
06/06/2024 COT - RSPL - Yard Water Line Passed 6/6/24: plumbing underground per plan ok to backfill. Shading required
06/06/2024 COT - RSPL - Sewer Passed 6/6/24: plumbing underground per plan ok to backfill. Shading required
06/06/2024 COT - RSPL - Rough Soil Passed 6/6/24: plumbing underground per plan ok to backfill. Shading required
06/17/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/17/2024 COT - RSEL - Grounding/Bonding Passed
06/17/2024 COT - RSBU - Preslab Passed
06/17/2024 COT - RSEL - Electrical Underground Passed
08/27/2024 COT - RSBU - Roof Nailing Passed
08/27/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/17/2024 BULD - Electrical Clearance Passed
11/18/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed M, P, AND E rough in complete. Okay to proceed with installation of insulation and drywall.
12/05/2024 COT - RSBU - Interior Shear Bracing Passed
03/14/2025 COT - RSEL - Electrical Final Passed Passed final 3/14/25 CLEARANCE ECO
03/14/2025 COT - RSEL - Outdoor Lighting Passed Passed final 3/14/25
03/14/2025 COT - RSME - Mechanical Final Passed Passed final 3/14/25
03/14/2025 COT - RSPL - Plumbing Final Passed Passed final 3/14/25
03/14/2025 RSBU - Building Final Passed Passed final 3/14/25
04/01/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
3X2 TRUSS CALCS_V1.PDF DOCUMENTS VIEW
3X2 TRUSS LAYOUT_V1.PDF DOCUMENTS VIEW
148281 PT BLDG 80 COMPLETE-2024-07-29_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CASITAS ON CATALINA - SIC BUILDING 80-2023-11-05_V1.PDF DOCUMENTS VIEW
CASITAS ON CATALINA - SITE PLAN BLDG 80_V1.PDF DOCUMENTS VIEW